ML20054H936

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Main Steam Support Structure Roof Beam to Column Connections Not Installed According to Drawings, Initially Reported 820511.Deficiency Determined Not Reportable Under 10CFR50.55(e)
ML20054H936
Person / Time
Site: Palo Verde  
Issue date: 06/08/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, 82-22, ANPP-21152-GHD, DER-82-22, NUDOCS 8206250221
Download: ML20054H936 (2)


Text

,,

4 Docket Nos. 50-528/529/530

50. 55 (e) Report I7 NM M Ef@ N @3[3@@T STA.

P.O. Box 21666 PHOENIX, ARIZONA 85036 June 8, 1982 ANPP-21152-CHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. T. W. Bishop, Chief Reactor Construction Projects Branch

Subject:

Deficiency Evaluation Report 82-22 A 50.55(e) Evaluation Relating to Units 1 & 2 Main Steam Support Structure Roof Beam to Column Connections Not According to Drawings File:

82-019-026 D.4.33.2

Reference:

Telephone Conversation between T. Bishop and G. Duckworth on May 11, 1982

Dear Sir:

The NRC was notified of the subject Deficiency Evaluation in the referenced telephone conversation, with a determination of reportability to be made within thirty (30) days (June 11, 1982).

The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e), therefore no written report is-required.

Necessary documentation of the evaluation will be maintained in APS files.

Very truly yours, hkg1 b

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db Attachment cc: See Attached Page 2 C

lL B206250221 820608 PDR ADOCK 05000528

U. S. Nuclear Regulatory Commission Attention:

Mr. T. W. Bishop, Chief ANPP-21152-Gild /BSK June 8, 1982 Page 2 e

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. llawkinson l

L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

liarmon & Weiss 1725 "I" Street, NW Suite 506 Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 l

h..

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _