Final Deficiency Rept Re Inadequate Main Control Panel TM-200 Wiring Separation,Initially Reported on 811230. Nonconformance Repts EC-1668 & EC-1669 Will Be Dispositioned to Provide Addl Electrical Barriers
ML20054H923
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/24/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21038-GHD, DER-81-53, NUDOCS 8206250200
Download: ML20054H923 (7)


Text

-

. 8 DESIG'ATED J OM CIJA),

) CtrtifiedEyl , , _..

TCPl?D STA.

3003 P.o. BOX 21666 - PHOENIX, ARIZONA 85036

'3///: f,

-/

DG;' , '

May 24, 1982 -

l ANPP-21038-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Chief Reactor Construction Projects Branch

Subject:

Final Report - DER 81-53 A 50.55(e) Reportable Condition Relating to Unit 1 Main Control Panel (JM-200) Violates Wiring Separation Requirements File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on December 30, 1981 (B) ANPP-20013, dated January 28, 1982 (Interim Report)

(C) ANPP-20744, dated April 22, 1982 (Time Extension)

Dear Sir:

Attached, is our final written report of the reportable deficiency, under 10CFR50.55(e), referenced above.

Very truly your

, CLLL d LLL ,

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske Attachment ec: See Attached Page 2 8206250200 820524 <

PDR ADOCK 05000528 0 PDR

~

. U. S. Nuclecr Rzgulatory Commission Attention: Mr. T. W. Bishop, Chief ANPP-21038-CHD/BSK May 24, 1982 Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555-J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW

-Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

i FINAL REPORT - DER 81-53 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 I. Description of Deficiency During a termination walkdown inspection, the Main Control Panel wiring was found to be in violation of IEEE-384-1974.

e NCR EC-1669 identifies Comsip, Incorporated installed internal wiring which has bundled Class IE wires (red and green) with Non-Class lE wires (black) . This par-ticular condition, however, is attributed to the Bechtel installation of Foxboro Miniature Records and shelf after Panel B06 had been delivered to the jobsite.

e NCR EC-1668 identifies several termination / routing conditions completed by Bechtel Construction in violation of separation requirements. This condition was discovered when the wiring was inspected to a later revision of the Installation Speci-fication 13-EM-306. Revision 5 of this Specification clari-fled separation and routing requirements for these particular applications.

II. Analysis of Safety Implications This condition is evaluated as Reportable under the requirements of 10CFR50.55(e). Electrical isolation and separation were inade-quate to assure that failure in one circuit would not cause failure in an adjacent safety-related circuit.

l l

l i III. Corrective Action i

NCR EC-1669 will be dispositioned to provide the addition of a barrier as directed by letter Comsip, ' Incorporated #AR-1229, dated March 23, 1982, copy attached.

NCR EC-1668 will be dispositioned to provide electrical separation l

and barriers as directed by Bechtel IOM-E-9637, dated March 23, i 1982, copy attached.

l Installation Specification 13-EM-306, Revision 5, was issued on l October 7, 1981. This revision provides additional instruction and direction for compliance to IEEE-384-1974. Compliance with this Specification will preclude recurrence for Units 2 and 3.

1 l

P Son Und.n NJ 07036

==

Comsip,inc. Eifs 2".?'cT' m3 4'Jn"'#!!'

March 24, 1982 Letter #AR-1299 Bechtel Power Corp.

11445 S. Lakewood Blvd.

Downey, CA 90241 W. G. Bingham Attention: Project Engineering Manager

Reference:

Bechtel PO #10407-13-JM-200 Comsip SO #5875 Bechtel Deficiency Evaluation Report No. 81-53, Subject Rev. O (Bechtel NCR'S #1668 and 1669)

Bechtel Ietter #B/CC-E-38291, Correspondence

Reference:

MOC 183669, dated 1/29/62 Gentlemen: t efer-Below is Comsip's response to your letter and repor s r enced above :-

Non-conformance Report No. E-C 1668 10, 1982, by our Mr.h A field trip was conducted on MarchY. Harpaz, to check for report. ith t

A careful inspection of all panel Comsip sections conducte as detailed below, non compliance was not due to installation.

There may be a possible deviation from the 6 separation ar the PR49/47 re-quirements by wires installed on panel sect. B0 , ne due to proximity to cable connectors.

Bechtel Power Corp.

W. G. Bingham Attn:

March 24, 1982  ;

i Page ders may require The field signal cable to the above 2 recorply with the separ-an addition of a barrier in order to com ation requirements. for the required We will accept to our account a field charget become necessary.

labor to install the 2 barriera, should i Non-conformance Report No. E-C 166982 by our Mr. Y.

d to in the re-A field trip was conducted on March lo,19Harpaz port. ducted with A careful inspection of all panel d sections conno area of non Bechtel field personnel and engineers, founThe wires and c ith the specification compliance.

adequately separated in conformance w requirements.

identical (with few liance found to Since all theee units are intended to beexceptions exist in the Unit 1 panels will also be f abricated in Unit 2 and 3 Panels are mpliance noted in Therefore, while the Unit 3 Main Control Roomhipment of the still under construction, any wiring non co referenced DER will be corrected before s 3 panels to the jobsite. the Unit 1 & 2 Main rrected at Comsip's Conditions of non compliance existing inControl R expense, as noted per our response to above .

9

,., i l

Bechtel Power Corp.

Attn:

W. G. Bingham March 24, 1982 f.

a Page e to I trust that you will find our investigation and respons this matter satisfactory.

Very truly yours, COMSIP INC.,

CUSTOMLINE DIVISION

' .~ QDfvk-K. Kopans,

' Project Manager KK/ss CC:

R. Sylvester - CICD Y. Harpaz "

D. Rankin "

  1. C. Ferdinand "

E. Walinski "

eT . Ingram "

M. Batson E.E, Van Brunt, Jr. - Bechtel

" (Downey)

B. Rhodes "

S'. Bagga "

D. Souteropoulis "

D. Guidetti " (Palo Verde) R (In-House) SQ W. Kerrigan t

i

s . . . _ ... .._.... _ . _ . . .____ -- - - --

Bechtel Power Corporation T

interoffice Memorandum f

r

~ '

To W. J. Stubblefield '"'*- E.11.03 IOM-E-9637 MOC 191507 subject ANPP Job 10407 D*

March 23, 1982 Electrical Separation in Main Control Board h'* W. G. Bingham

  • Engineering cop e to W. H. Wilson ^' LAPD Ext.

339 F. Herman F. R. Sticn K. Soteropoulos T. E. Hartman .

V. Arora All w/ enc 1. '

This will inform you that E*.agineering has performed a field walkdown to inspect Electrical Separation Problems in Unit 1 Main Control Boards as a result of Field Memo RE-056, dated October 14, 1981.

, Project criteria for wire / cable safety separation is based on meeting Regulatory Guide 1.75 and is noted specifically in Specification 13-EM-306, Section 11.0. A minimum of six (6) inches between redundant Class IE field cables or internal redundant Class IE wirir.g is required when relying on air separation. The safety separation may be reduced to one (1) inch (wire to barrier) if acceptable barriers are utilized. Please be advised that as a result of the field inspection, non-compliances to this criteria were discovered.

To date, only an advance copy of NCR EC-1668, which addresses separation in Main Control Boards but doesn't include all the non-compliances cited during the field walk, has been received by Engineering. Specifics determined at the time of walkdown are enclosed for your information with Electrical's input provided to aid in determining formal dispositions. For cases where separation non-conformances have not been included in NCRs written to date it is suggested that the field perform the necessary modifications with consent of vendor in order to fix the separation deficiencies or issue appropriate NCRs for specific dispositioning.

We would also like to advise that special precautions be taken to avoid similar separation problems in Units 2 and 3 implemen-tations.

W. G. Bingham WGB:ST:lec

Enclosure:

Separation Non-Conformances in MCB (15 pages, 1 copy)

Mo-*M* 8*TA "* ^ a *8 l' t"