ML20054H916
| ML20054H916 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/08/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-21149-GHD, DER-82-12, NUDOCS 8206250191 | |
| Download: ML20054H916 (3) | |
Text
_
Docket Nos. 50-528/529/530
/p 50.55(e) Report EKEWED 4-W b
W 4
3 3
j STA.
P.O. Box 21666 PHOENIX. ARI2oNA 85036 June 8, 198b' ' '
ANPP-21149-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop, Chief Reactor Construction Projects Branch
Subject:
Final Report - DER 82-12 A 50.55(e) Reportable Condition Relating to Instrument Clamps Installed Without Calculations for Thermal Expansion.
File: 82-019-026 D.4.33.2
Reference:
(A) Telephone Conversation between J. Eckhardt and C. Duckworth on March 26, 1982 (B) ANPP-20778, dated April 22, 1982 (Time Extension)
(C) ANPP-20912, dated May 7, 1982 (Interim Report)
Dear Sir:
Attached, is our final written report of the reportable deficiency, under 10CFR50.55(e), referenced above.
Very truly yours, bb
((
htAt Of/2 E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db Enclosure cc:
See Page 2 8206250191 820608
~
PDR ADOCK 05000528 C
PDR y,q - jg cj
FINAL REPORT - DER 82-12 DEFICIENCY EVALUATION 50.55(e)
ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1,2 & 3 I.
Description of Deficiency The Controls Discipline Field Engineer review of installation documents in preparation for completing N-5 Code Data Reports discovered that the 3D Clamps securing the instrumentation lines were not installed in ac-cordance with the requirements of installation specification 13-JM-702 Appendix B.
These requirements provide for thermal expansion of the tubing.
II.
Analysis of Safety Implications This condition is evaluated as reportable since if not detected and repaired it could possibly result in loss of essential instrumentation.
III.
Corrective Action Nonconformance Report JX-512 will be dispositioned to review and rework all discrepancies to the requirements of the installation specification.
The individuals responsible for these installations have reviewed this report to preclude recurrence.
The installation specification will be clarified by issuance of a specification change notice 3019 to provide additional guidance for installing instrument tubing to compensate for thermal expansion.
i i
I l
f I
i L
s U. S. Nucisar R:guletory Comiezion Attention:
Mr. T. W. Biehop, Chief June 8, 1982 ANPP-21149-CllD/Bsk Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. ilawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.
Ilarmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C.
20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 I
i l
__-_____--_--_-_a