Docket Nos. 50-528/529/530 hf(V d
- 50. 55 (e) Report f! ICE!1:0
- [ f ** g STA.
P.O. BOX 21666 PHOENIX. ARIZONA 85036 June 8, 198220!s.;,",
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop, Chief Reactor Construction Projects Branch Subj ect:
Interim Report - DER 82-24 A 50.55(e) Potentially Reportable Deficiency Relating to Weld Procedure Not Qualified by Ametek-Straza for Reactor Hot Leg Pipe Stops File: 82-019-026 D.4.33.2
Reference:
Telephone Conversion between T. Bishop and G. Duckworth on May 14, 1982
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportablility would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by September 17, 1982, at which time a complete report will be submitted.
Very truly yours, On 4%Y(jf(2 E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db Attachmen:
cc:
See Attached Page 2 IE D 8206250148 820608 PDR ADOCK 05000528 S
PDR_
. T). }{s R
]
U. S. Nuc1 car R:guistory Commission Attention:
Mr. T. W. Bishop, Chief ANPP-21154-GHD/BSK June 8, 1982 Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel-D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen C. A. Fiorelli Lynne Bernabei, Esq.
Ilarmon & Weiss 1725 "I" Street, NW Suite 506 Washington, D. C.
20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 I
f-i
INTERIM REPORT - DER 82-24 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1, 2 & 3 1.
Potential Problem Project procurement specification 13-CM-125B for miscellaneous Structural Steel awarded to Ametek Straza, paragraph 4.13.4 requires that "all weld procedures shall be submitted and approved prior to the start of fabrication.... Welding procedures which conform with Sections 2,3,4 and 8 of the Structural Welding Code AWS DI.1, shall be deemed as pre-qualified and are exempt from tests for qualification. Other procedures shall be qualified by tests as precribed in Section 5 of AWS D1.1."
C.E. drawing El%273-320-270 specifies a shop weld between ASTM A514 Grade F and AS1:8 A579 Grade 12 material for the NSSS "E" (llot Leg Pipe) stops. ASTM /379 is not a material listed under Section 8 of AWS DI.1, hence qualification tests are required.
A review of the welding procedures applicabic to this order revealed that the vsid between the above materials was made without the supplier submittiny,the required weld procedure to Bechtcl for review prior to welding.
II.
Approach To and Status Of Proposed Resolution Ametek Straza is currently preparing and qualifying the required weld procedure for Bechtel review.
III. Projected Completion Of Corrective Action And Submittal Of Final Report 3
Evaluation of this condition and submittal of the Final Report is Forecast to be completed by September 17, 1982.
(