Notifies That 2-wk Special Team Assessment of Onsite Const Program Will Begin on 820621.Evaluation Will Include QA Program Interfaces & Overviews,Corrective Action Sys,Design Change Control & Electrical Cable Installation
ML20054H883
Person / Time
Site: Fermi 
Issue date: 06/21/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Tauber H
DETROIT EDISON CO.
References
NUDOCS 8206250134
Download: ML20054H883 (2)


Text

_.

1N t

JUN 2 Docket No. 50-341 h Detroit Edison Company ATTN: Mr. Harry Tauber Vice President Engineering and Construction 2000 Second Avenue Detroit, MI 48226 Gentlemen:

During the next few weeks this office will be performing special team assessments of the construction programs at selected nuclear power plants, i

under construction in Region III, including your Fermi 2 Nuclear Power Plant beginning June 21, 1982. This letter confirms the information discussed earlier this month by our Mr. Monklin and your staff by telephone.

j h purpose of this special effort is to determine if there are indications of existing or potential construction problems similar to some of those identified at a number of other plants under construction.

h assessment team is composed of a Region III Section Chief as team leader, the Senior Resident Inspector, and three or four technical specialists. h onsite phase of the assessments is expected to be approximately two weeks in duration.

i h scope of the assessments includes quality assurance progreat interfaces i

and overviews, corrective action systems, design change control, material traceability of installed structures and components, electrical cable

{

installation, inprocess inspections, and effectiveness of quality control j

inspectors. In assessing these areas, the team may identify areas of waakaass or examples of poor practice in addition to any identified items j

of noncomplisace. You will be expected to respond to all substantive findings identified in the assessment report.

You are requested to provide full ccoperation to the assessmaat team.

)

As part of that cooperation, team members should be permitted unfettered access to the facility, and authorizations should be provided for the use of cameras onsite.

l G206250134 820h21 gDRADOCK05000

[OI omap RIII RIII RIII )

RIII RIII RIII RIII g

b horelius.

S Litt Spe D

r summ >

.........f.......

gl.&..

b

[

om > 6/21/82

..t

( OFMICI AL RECORD COPY nnc ronu ais <io soi uncu ono

t IJUN 21 1962 The Detroit Edison Company We appreciate your cooperation. If you have any questions concerning this matter please contact Mr. W. S. Little of this office.

Sincerely, P

James G. Keppler Regional Administrator cc: DMB/ Document Control Desk (RIDS)

Resident inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voigt, Esq.