Text
_.
1N t
JUN 2 Docket No. 50-341 h Detroit Edison Company ATTN: Mr. Harry Tauber Vice President Engineering and Construction 2000 Second Avenue Detroit, MI 48226 Gentlemen:
During the next few weeks this office will be performing special team assessments of the construction programs at selected nuclear power plants, i
under construction in Region III, including your Fermi 2 Nuclear Power Plant beginning June 21, 1982. This letter confirms the information discussed earlier this month by our Mr. Monklin and your staff by telephone.
j h purpose of this special effort is to determine if there are indications of existing or potential construction problems similar to some of those identified at a number of other plants under construction.
h assessment team is composed of a Region III Section Chief as team leader, the Senior Resident Inspector, and three or four technical specialists. h onsite phase of the assessments is expected to be approximately two weeks in duration.
i h scope of the assessments includes quality assurance progreat interfaces i
and overviews, corrective action systems, design change control, material traceability of installed structures and components, electrical cable
{
installation, inprocess inspections, and effectiveness of quality control j
inspectors. In assessing these areas, the team may identify areas of waakaass or examples of poor practice in addition to any identified items j
of noncomplisace. You will be expected to respond to all substantive findings identified in the assessment report.
You are requested to provide full ccoperation to the assessmaat team.
)
As part of that cooperation, team members should be permitted unfettered access to the facility, and authorizations should be provided for the use of cameras onsite.
l G206250134 820h21 gDRADOCK05000
[OI omap RIII RIII RIII )
RIII RIII RIII RIII g
b horelius.
S Litt Spe D
r summ >
.........f.......
gl.&..
b
[
om > 6/21/82
..t
( OFMICI AL RECORD COPY nnc ronu ais <io soi uncu ono
t IJUN 21 1962 The Detroit Edison Company We appreciate your cooperation. If you have any questions concerning this matter please contact Mr. W. S. Little of this office.
Sincerely, P
James G. Keppler Regional Administrator cc: DMB/ Document Control Desk (RIDS)
Resident inspector, RIII Ronald Callen, Michigan Public Service Commission Harry H. Voigt, Esq.
4 i
_