Part 21 Rept Re Diesel Generator Fuel Oil Storage Tank Room Fan Motor Qualification,Essential Cooling Water Gantry Crane Tornado Design & Emergency Sump Recirculation Piping Overstress.Resolution of Items Now Bechtel Responsibility
ML20054H134
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/11/1982
From: Rice W
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-82-624-000 PT21-82-624, PT21-82-624-000, NUDOCS 8206230013
Download: ML20054H134 (2)


Text

.dY Brown fSRoot,Inc.

rost one Box nuce. nousion. Texas 7700, A Halhburton Company w,lL.m M. R,c.

N.

N G,wp V.c PewJent

~

Po

.e Grwp (713) 676-3571 June 11, 1982 Mr. Richard C.

DeYoung, Director Office of Incpection and Enforcement U.

S.

!Juclear Regulatory Commiccion Washington, D.

C.

20555

Dear Mr. DeYoung:

On May 18, 1981, Brown & Root, Inc. provided the fluelear Regulatory Comninnion (!!RC ) written notification of the following three (3) itema determined to be reportable purcuant to 10CFH21:

1.

Diesel Generator Fuel Oil Storage Tank Room Fan Motor Qualification 2.

Ennential Cooling Water Gantry Crane Tornado Decign 3

Emergency Sump Recirculation Piping Overstress Additionally, on May 12, 1981, Brown & Root provided written notification per 10CFR21 of a problem with the design of the HVAC syntem for the Mechanical-Electrical Auxiliary Building and the Fuel Handling Building.

A cupplemental report on HVAC nyctem design was provided to the !!RC on June 30, 1981.

All four of the above itema involved design work performed by Brown & Root for the South Texac Project, Unit.a 1 and 2.

These itenn were alno reported to the IIRC by Haunton Light,ing & Power Company pursuant to 10CFR50.55(e).

In order to close out the four items reported under Part 21, Brown & Root committed to completing certain corrective actions a:, presented in our reports and was per-forr;ing the work necennary to fulfill our conmitments con-cictent with project schedules.

On September 24, 1981, Houston Lighting & Power Company removed Brown & Root ac the engineer of the South Texas Project.

Since that date, Brown & Root hac been enraged in activities to statun and trancrer our engineerint work to Pechtel Power Corporation, the new enrineer for the South Texas Project.

As a result of Houston Lighting & Power si$

B206230013 820611 PDR ADOCK 05000498 S

PDR

=

i Mr. Richard DeYoung June 11, 1982 l

Page 2 1

J Company's actions, the resolution of these items is now a l

Bechtel/ Houston Lighting & Power responsibility.

The status l

of our design relative to the four items has been provided to Bechtel in the associated Brown & Root transition work packages.

1 Should the NRC require any information from Brown & Root relative to this matter, please contact me or Mr. Peter Jordan i

at (713) 678-9258.

t Very tru

yours, s

-C William M. Rice WMR/cmb cc:

Karl V. Seyfrit, Director Office of Inspection and Enforcement - Region IV i

U. S.

Nuclear Regulatory Commission 4

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102 D. G.

Barker, Manager South Texas Project Electric Generating Station i

Houston Lighting and Power Company l

P. O. Box 1700 I

Houston, Texas 77001 R.

L. Rogers, Engineering Manager 4

South Texas Project Electric Generating Station Bechtel Power Corporation 5575 Del Monte Drive P. O. Box 2166 j

Houston, Texas 77001

~

i l

i

_ _ _ _ - - _ - _ -