.dY Brown fSRoot,Inc.
rost one Box nuce. nousion. Texas 7700, A Halhburton Company w,lL.m M. R,c.
N.
N G,wp V.c PewJent
~
Po
.e Grwp (713) 676-3571 June 11, 1982 Mr. Richard C.
DeYoung, Director Office of Incpection and Enforcement U.
S.
!Juclear Regulatory Commiccion Washington, D.
C.
20555
Dear Mr. DeYoung:
On May 18, 1981, Brown & Root, Inc. provided the fluelear Regulatory Comninnion (!!RC ) written notification of the following three (3) itema determined to be reportable purcuant to 10CFH21:
1.
Diesel Generator Fuel Oil Storage Tank Room Fan Motor Qualification 2.
Ennential Cooling Water Gantry Crane Tornado Decign 3
Emergency Sump Recirculation Piping Overstress Additionally, on May 12, 1981, Brown & Root provided written notification per 10CFR21 of a problem with the design of the HVAC syntem for the Mechanical-Electrical Auxiliary Building and the Fuel Handling Building.
A cupplemental report on HVAC nyctem design was provided to the !!RC on June 30, 1981.
All four of the above itema involved design work performed by Brown & Root for the South Texac Project, Unit.a 1 and 2.
These itenn were alno reported to the IIRC by Haunton Light,ing & Power Company pursuant to 10CFR50.55(e).
In order to close out the four items reported under Part 21, Brown & Root committed to completing certain corrective actions a:, presented in our reports and was per-forr;ing the work necennary to fulfill our conmitments con-cictent with project schedules.
On September 24, 1981, Houston Lighting & Power Company removed Brown & Root ac the engineer of the South Texas Project.
Since that date, Brown & Root hac been enraged in activities to statun and trancrer our engineerint work to Pechtel Power Corporation, the new enrineer for the South Texas Project.
As a result of Houston Lighting & Power si$
B206230013 820611 PDR ADOCK 05000498 S
=
i Mr. Richard DeYoung June 11, 1982 l
Page 2 1
J Company's actions, the resolution of these items is now a l
Bechtel/ Houston Lighting & Power responsibility.
The status l
of our design relative to the four items has been provided to Bechtel in the associated Brown & Root transition work packages.
1 Should the NRC require any information from Brown & Root relative to this matter, please contact me or Mr. Peter Jordan i
at (713) 678-9258.
t Very tru
- yours, s
-C William M. Rice WMR/cmb cc:
Karl V. Seyfrit, Director Office of Inspection and Enforcement - Region IV i
U. S.
Nuclear Regulatory Commission 4
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102 D. G.
Barker, Manager South Texas Project Electric Generating Station i
Houston Lighting and Power Company l
P. O. Box 1700 I
Houston, Texas 77001 R.
L. Rogers, Engineering Manager 4
South Texas Project Electric Generating Station Bechtel Power Corporation 5575 Del Monte Drive P. O. Box 2166 j
Houston, Texas 77001
~
i l
i
_ _ _ _ - - _ - _ -