ML20054H102

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/82-14 on 820419-22.No Noncompliance Noted
ML20054H102
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/24/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054H103 List:
References
NUDOCS 8206220576
Download: ML20054H102 (2)


See also: IR 05000335/1982014

Text

[

~

I

OFFICIAL. RECORD COPY

,

MAY 2 41982

1

,

a

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report No. 50-335/82-14

This refers to the routine safety inspection conducted by Mr. C. D. Evans of this

office on April 19-22, 1982, of activities authorized by NRC Operating License

No. DPR-67 for the St. Lucie facility and to the discussion of our findings held

with Mr. N. G. Rous, Quality Control Supervisor, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

3

personnel, and observations by the inspector.

The Region II Mobile Laboratory

.

was also brought to your site and used by the inspector to make certain inde-

pendent measurements. The basic purpose of these independent measurements is to

,

verify your capability for analyzing radioactive effluents, and to achieve and

'

maintain comparable methods of analyses between your f acility and the NRC. The

complete data from these measurements will be reported in a subsequent Inspection

Report.

Within the scope of this inspection, no violations or deviations were disclosed.

.

We have examined actions you have taken with regard to previously reported

'

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

,

.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

8206220576 820524

DR ADOCK 05000

. _ . . _ _

. _ _ _ _ _ _

.

.

.

2

A

Florida Power and Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

Inspection Report No. 50-335/82-14

cc w/ encl:

C. M. Wethy, Plant Manager

N. Weems, Assistant QA

Construction Manager

bcc w/ encl:

NRC Resident Inspector

State of Florida

Document Management Branch

RII d'

RII

RII

(i\\ '1,'\\ (~

h .)N

gy

RII(LID

-

C

CDEvans:ejw

DMMontgomery

KDLandis

HCDance

5/' /82

5/H 82

5/ja/82

5/v /82

p

i

_ _ _ _

l