ML20054G899

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-277/82-07 & 50-278/82-07 on 820420-21 & 26-30.No Noncompliance Noted
ML20054G899
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/03/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20054G900 List:
References
NUDOCS 8206220392
Download: ML20054G899 (2)


See also: IR 05000277/1982007

Text

_

,

( - 13 - ? t

./

o

JUN 0 31982

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice-President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/62-07 and 50-278/82-07

This refers to the routine safety inspection conducted by G. Napuda of this

office on April 20 - 21 and 26 - 30, 1982 at Peach Bottom Atomic Power

Station, Units Nos. 2 and 3, Delta, Pennsylvania, and your corporate office

in Philadelphia, Pennsylvania, of activities authorized by NRC License Nos.

DPR-45 and DPR-46 and to the discussions of our findings held by G. Napuda

with Messrs. R. Fleishman and R. Moore, II, and other members of your staff

at the conclusion of the inspection, and to subsequent telephone discussions

between Mr. D. Caphton and Mr. P. Pavlides of your staff on May 4 and 10,

1982.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and repre-

sentative records, interviews with personnel, and observations by the

inspector.

i

Our inspector also verified the steps you have taken to correct the violation

brought to your attention in the enclosure to our letter dated April 21,

1977. We have no further questions regarding your action at this time.

l

Within the scope of this inspection, no violations were observed.

1

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this

l

office, by telephone, within ten days of the date of this letter and submit

I

written application to withhold information contained therein within thirty

days of the date of this letter.

Such application must be consistent with

,

j

the requirements of 2.790(b)(1).

The telephone notification of your intent

to request withholding, or any request for an extension of the 10 day

period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

OFFICIAL RECORD COPY

f

)

!

'

8206220392 820603

l

PDR ADOCK 05000277

'

O

PDR

L

- - . - -

,

..

.

Philadelphia Electric Company

2

Your cooperation with us in this matter is appreciated.

Sincerely,

Oristmal signed sy:

I

-

homas T. Martin, Director

a

Division of Engineering and

Technical Programs

Enclosure:

Combined NRC Region I Inspection Report Number 50-277/82-07;

50-278/82-07

cc w/ enc 1:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr. , Esquire (without report)

Eugene J. Bradley, Esquire (without report)

Raymond L. Hovis, Esquire (without report)

Michael J. Scibinico, II, Assistant Attorney General (without report)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (with concurrences)

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire

Raymond L. Hovis, Esquire

Michael J. Scibinico, II, Assistant Attorney General

Chief, Operational Support Section (w/o encl)

Ebe C. McCabe, Chief, RPS #2B

q:,

qw

RI:DETP ' ' f.

RI:DE P

RI:DETP

Napuda/dmgl

Caphto,fj'

Ql

n

Ebne er

$/;Q'j

5/I7/82

OFFICIAL RECORD COPY