ML20054G803
| ML20054G803 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/27/1982 |
| From: | Mardis D FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3F-0582-27, 3F-582-27, NUDOCS 8206220314 | |
| Download: ML20054G803 (3) | |
Text
--
)
.9 T
' i NRC REng,7',
Ad. 4 A N TA, g r,,a.e,,f,
e
-w, w
fiQ $
'UQwo R nn 2 nio ; 3 c M
M
.P. o...w..e...r.
May 27,1982
- 3F-0582-27 File: 3-0-3-a-3 l
Mr. 3. P. O'Reilly, Regional Administrator Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N. W., Suite 3100 Atlanta, GA. 30303
SUBJECT:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Inspection Report Nos. 81-21 and 81-25
Dear Mr. O'Reilly:
Florida Power Corporation (FPC) has received and reviewed your confirmatory action letter of March 10, 1982. The actions that FPC will undertake are as stated in that letter, i.e.,
your understanding of FPC's actions is the same as our understanding. Those actions are:
1.
Verify operability of fire dampers and perform subsequent inspections of safety-(
related dampers and fire doors in accordance with our existing procedures.
l 2.
If any fire door or damper is found to be inoperable, the following action will be I
taken:
a.
Establish a continuous fire watch on at least one side of the affected fire door or damper within one hour.
i b.
The continuous fire watch is to be maintained until such time that the inoperable fire door or damper is repaired.
3.
Continue the above actions until the amended technical specifications have been approved by NRR. Changes to the above actions will have prior concurrence by NRC Region 11 prior to implementation.
t 9206220314 820527 DR ADOCK 05000 g
General Office 3201 wty foutn street souin. P O Box 14042. st Petersburg Fiorda 33733 e 813-866 5151
'i Mr. 3. P. O'Reilly, Regional Administrator U. 5. Nuclear Regulatory Commission, Ril Page May 27,1982 In discussions with NRR, it was decided that FPC would not apply for any fire protection technical specification change until the Appendix R review for CR-3 was completed. The above actions will be performed by FPC until those changes are approved by NRR.
Very truly yours,
%/ 6.SA David G. Mardis Acting Manager Nuclear Licensing RMB/ mig cc:
Document Control Desk 1
T*
STATE OF FLORIDA COUNTY OF PINELLAS D. G. Mardis states that he is the Acting Manager, Nuclear Licensing, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
bd D. G. Marc:is Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 28th day of May,1982.
/
Notqpy Public Notary Public, State of Florida at Large, l
My Commission Expires: May 29,1984 I
l 1