Notice of Issuance & Availability of Amend 74 to License NPF-1
ML20054F859
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/10/1982
From: Trammell C
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20054F856 List:
References
NUDOCS 8206180019
Download: ML20054F859 (2)


Text

.--

7590-01 UNITED STATES HUCLEAR REGUL'ATORY COMMISSION DOCKET NO. 50-344 PORTLAND GENERAL ELECTRIC COMPANY, ET AL.

~

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY ~

OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 74 to Facility Operating License No NPF-1, issued to Portland General Electric Company, the City of Eugene, Oregon, and Pacific Power and Light Company (the licensees), which revised the

~

~

Technical Specifications for operation of the Trojan Nuclear Plant (the facility) located in Columbia County,. Oregon. The amendment is effective as of the date of issuance..

The amendment deletes from the Technical Specifications certain require-ments for pump and valve testing which are now covered under the Codes

' and Standards Rule, 10 CFR 50.55a. This rule requires that certain 1

tests on pumps and valves to verify operational readiness be conducted 1

in accordance with Section XI of the ASME Code, " Rules for Inservice Inspection of Nuclear, Power Plant Components".

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was l

not required since this amendment does not involve a significant hazards consideration.

J a:acaATro onIcIIIAL

Tbbljh W

Certt:1ca By l

a V

8206180019 820610 PDR ADOCK 05000344 P

PDR

~

7590-01 2-The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendme,nt dated April 28, 1982, (2) Amendment No. 74 to License No. NPF-1 and (3) the Commission's letter dated June 10, 1982.

All of thes,e items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the local public document room located at the Multnomah County Library, Social Science and Science Department, 801 S.W.10th Avenue, Portland, regon' 97205. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Directo'r, Division of Licensing.

Dated at Bethesda, Maryland, this 10th day of June,1982.

FOR THE NUCLEAR REGULATORY COMMISSION L U fl -

[jNQ Charles M. Trammell, III, Acting Brandh Chief Operating Reactors Branch #3 Division of Licensing T