ML20054F758

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept Re Fillet Welds Omitted from HVAC Ductwork Stiffeners,Initially Reported on 820305.Vendor Instructed to Complete Welds as Originally Designed. Also Reported Per Part 21
ML20054F758
Person / Time
Site: Marble Hill
Issue date: 06/14/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, S82-05, S82-5, SVP-0006-82, SVP-6-82, NUDOCS 8206170293
Download: ML20054F758 (2)


Text

-

PUBLIC SERVICE INDIANA June 14, 1982 S82-05 S. W. Shields SVP-0006-82 Sennar Vke Presalent Nuclear Divesson Mr. James G. Keppler, Docket Nos.:

STN 50-546 Regional Administrator STN 50-547 U.S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn. Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 5,1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). Pullman Construction Industries', Inc.

(PCI) shop issued a report under 10 CFR 21 identifying that certain fillet welds had been omitted from heating, ventilating and air conditioning (HVAC) ductwork stiffeners. Some of this ductwork has been delivered to the site by PCI.

Review of this condition by the plant designer, Sargent & Lundy, indicates that some of the ductwork will require the presence of the missing weld to perform adequately. PSI has therefore instructed PCI to complete the welds as originally designed.

For ductwork previously delivered to the site the welds will be repaired during the erection process.

This letter is intended to fulfill the requirements of a final report as defined in 10 CFR 50.55(e).

If you have any questions on this report, please feel free to contact me.

Sincerely, S. W. Shields SWS/TDG/bak 8206170293 820614 PDR ADOCK 05000546 S

PDR l

JUN 141982 P O Box 190, New Washington, InWana 47162 812. 289. 3000 1 4 44

SERVICE IMANA James G. Keppler

' ~

June 14, 1982.

S82-05

'SVP-0006-82 cc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington,.D. C.

20555 J.'E. Konklin J. J. Harrison l

i t

l l

. -.