Forwards IE Insp Rept 50-397/82-09 During Apr 1982.No Noncompliance Noted
ML20054F207
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/27/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20054F208 List:
References
NUDOCS 8206150315
Download: ML20054F207 (2)


See also: IR 05000397/1982009

Text

U

6

0

4

,e

-

.

MAY 2 71982

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention:

Mr. R. G. Matlock

l

Program Director

1

Gentlemen:

l

Subject:

hkC INSPECTION

This refers to the routine inspection conducted by Mr. R. Feil

of this office during April, 1982, of activities authorized by

NRC Construction Permit No. CPPR-93, and to the discussion of

our findings held by Mr. Feil with Mr. C. Wright and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

l

No items of noncompliance with NRC requirements were identified

within the scope of this inspection.

l

I

in accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless

'

you notify this office, by telephone, within ten days of the date

of this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of

2. 790 (b) (1) .

r206150315 820527

PDR ADOCK 05000397

0

PDR

/$f

a"'c + . . n.v. e ggj., . ..y12........ ..<.{.g......

. . . . .........

.... .. . . ... ..

........ ... ...

..

. ...

o " ^"'>

.L..hil..

L . . .Dg ,d d ,s ,,,, , L. ,,E 1,@pp,, ,,

,,,, , ,,

,,,,,,

, , ,, , ,, ,,,,,,

,

, ,,, ,

, ,,

,

,

c '" > ..si.7.4.i.a2... .s.1Mja2....... 5.1.21a2........ ........ .. .......

...... . ...... .

. . . . . . . . . . . . .

.... .

. ..

C9RC FORM 318110 808 NRCM O240

+ USGPO 1980-329 824

_

-

__

-

.

i

inspection, we will

ahaveany,questionsconcerningths

houl

-ge glad

iscuss tnem with you.

Sincerely,

Original signed by

T. W. Bishop

T. W Bishop, Chief

Reastor Construction Projects Branch

Enclosure:

liRC Inspection Report

1;o . 50-397/82-09

,

i

cc w/ enclosure:

'

'

'

R. L. Glasscock, Quality Assurance Director

.

l

C. S. Carlisle, Deputy Frogram Manager

!

!

l

^r

bcc: DMB/ Document Control Desk (RIDS)

's

i

l

N

.

Distributed by RV:

l

Engelken (w/o enclosure)

'

Project Inspector

'

i

Resident Inspector

State of WA (Lewis)

.g

,

l

l

t

i

I,

!

i

!

i

i

l

l

!

.

e-

-

4

-

. _ _ . _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ .