ML20054F172
| ML20054F172 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 06/10/1982 |
| From: | Colombo R SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | |
| Shared Package | |
| ML20054F170 | List: |
| References | |
| NUDOCS 8206150281 | |
| Download: ML20054F172 (3) | |
Text
.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-312 Rancho Seco Unit 1 WIT DATE 82-05-31 COMPLETED BY R. Colombo TELEPHONE (916)452-3211 MONTH May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 0 0
1 37 2
0 18 0
0 3
0 19 4
20 0
5 0
21 0
0 6
22 n
0 7
23 0
8 0
24 0
9 25 0
to 0
26 0
~
0 1I 27 n
12 28 0
13 0
29 0
14 30 0
0 15 0
3 0
16 INSTRUCTIONS On this format. list the average daily unit power lesel in NIWe-Net for each day in the reporting month. Compute to the nearest whole mecanatt.
19/77) 8206150281 820610 PDR ADOCK 05000312 R
. _ _. _ _., _ _ _ _ _ _. _ _ _. ~.. _. _ _. _ _ _. _
9 OPERATING DATA REPORT DOCKET NO.
50-312 DATE 82-05-31 COMPLETED BY
-D. Colombo TELEPHONE (416) 452-3211 OPERATING STATUS Notes Item 23 year-to-date Rancho Seco Unit 1
- 1. Unit Name:
and cumulative flgures con-May, 1982
- 2. RePortin8 eriod.
P tain a Correction to the 2772
- 3. Licensed Therma. Power (MWt):
April 1982 report.
963
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design ElectricalRating(Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
917 873
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
N/A N/A
- 9. Power Level To which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to-Date Cumulative 744 3623 62,424
- 11. Hours In Reporting Period 0
R W.3 3/, W.9
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 744 940 7,398.6
- 14. Hours Generator On-Line 0
2152.9 35,923.3
- 15. Unit Reserve Shutd:wn Hours 0
0 1,210.2
- 16. Gross Thermal Energy Generated (MWH) 0 4.702.938 97.598.050
- 17. Gross Electrical Energy Generated (MWH) 0 1.576.517 30,337,946
- 18. Net Electrical Energy Generated (MWH) 0 1.479.078 28.642.195
- 19. Unit Service Factor 0
59.4%
57.5%
0 59.4%
59.5%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 0 46.8%
52.6%
- 22. Unit Capacity Factor (Using DER Net) 0 44.5%
50.0%
- 23. Unit Forced Outage Rate 0
0.7%
29.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:
Refueling and TMI modifications, January 1983, 6 months.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
Aug-Sept 1982
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A to/77)
DOCKET NO. 50-312 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT N AME Ranchn Spen finit I DATE 82-05-31 COMPLETED IIY P.
rninmhn REPORT MONTil May 1982 TELEPil0NE (916)452-32ii E
e
.E E "g
$.Y 3 Licensee y t, c%
Cause & Corrective
- 2. "
Action to No.
Date g.
3g
,g g $
Event g'
!g Prevent Recurrence H
$E Te ;f, c Report #
rd u g
u O
07 82-04-03 S
744 B
1 82-010 O1T CH XXXXXX Repair and modify 0TSG Auxiliary Feedwater Ring Headers.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data II. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Examination F Administrative
'S G Operational Error (Explain)
Exhibit ! - Same Source (9/77)
Il Other (Explain)