ML20054E700
| ML20054E700 | |
| Person / Time | |
|---|---|
| Issue date: | 05/27/1982 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Statton C BECHTEL GROUP, INC. |
| Shared Package | |
| ML20054E701 | List: |
| References | |
| REF-QA-99900522 NUDOCS 8206140082 | |
| Download: ML20054E700 (2) | |
Text
W.
gg 27 Cocket No. 99900522/82-01 Bechtel Power Corporation San Francisco Power Division ATTN:
Mr. C. D. Statton Vice President and General Manager P. O. Box 3965 San Francisco, CA 84119 Gentlemen:
This refers to the inspection conducted by Mr. J. R. Costello of this office on April 19-23, 1982, of your facility at San Francisco, California, and to the discussion of our findings with Mr. C. W. Dick and members of your staff at the conclusion of the inspection.
Areas examined during this inspection and our findings are documented in the enclosed inspection report.
Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet the commitments of your Topical Report No. BQ-TOP-1 or NRC requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any i
information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter l
4
/
RIV FI CI:RSS4E SC:RSS BC:VPB D:IES RA:RIV j
JRCostallo/rf CJHale UPotapovs EHJohnson JTCollins
/
5/25/82 5/3 082 5/ $ 82 5/t1/82 5/7 /82 U
YA/
fy'I 8206140082 820527 PDR GA999 EECBECH h
99900522 PDR
Bechtel Power Corporation has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, mor:Weet 5sned CW U. PDTAPWS' Uldis Potapovs, Chief Vendor Programs Branch
Enclosures:
1.
Appendix A - Inspection Report No. 99900522/82-01 2.
Appendix B - Inspection Data Sheets (8 pages) bcc:
IE Files AE0D QAB NRC:PDR Reg. Administrators, I, II, III, IV, V EHJohnson, RIV l