Forwards IE Insp Rept 50-445/82-05 on 820419-23.No Noncompliance Noted
ML20054E668
Person / Time
Site: Comanche Peak 
Issue date: 05/28/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20054E669 List:
References
NUDOCS 8206140052
Download: ML20054E668 (2)


See also: IR 05000445/1982005

Text

-

--

_

,

-.

, , _

,

In Reply Refer To:

Dockets:

50-445/S2-05

Texas Utilitics Generating Company

ATTN:

Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Messrs. R. H. Brickley, and

C. E. Johnson of our staff during the period April 19-23, 1982, of

activities authorized by NRC Construction Permit CPPR-126 for the

Comanche Peak facility, Unit 1, and to the discussion of our findings

with Mr. R. G. Tolson of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of the inspection, no violations or deviations were

identified.

One new unresolved item is identified in paragraph 2 of the enclosed NRC

Inspection Report 82-05.

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

l

date of this letter.

Such application must be consistent with the require-

.

l

ments of 2.790(b)(1).

.

I

b'

i

G

J

RIV

(

I

l

CE:RSS

SC:RSS

I

RPB2 /

PB1 6

BC:VPgl/

D:IES

RA:RIV

5/2d/82'fiWCSeidle

CJHale /

GLMt:Isen WdcHUPotap6vs

EHJohnson JTCollins

RHBrickley:gb

5/t.o/82

5/p/82 f,O/ty5/f/82

5 6 /82

5/,27/82

5/19/82

l Y

.

Sn%Ehnnjh

i

e

MEC

,

._

.

.

,

Texar Utilities Generating Co.

2

Should you have any questions concerning this inspection, we will be pleased

te discuss them with you.

Sincerely,

/

/

G. L. Madsen, Chief

Reactor Projects Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-445/82-05

cc w/ enclosure:

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

bec to DMB for dist. -----

bec dist. by RIV -----

BC

NRR/DHFS

RRI

PM

NRR/0LB

Regional Administrator

AE00

RAD ASMT BR

Section Chief

ELD

RESEARCH

Enforcement Assistant

IE FILE

LPDR

MIS Section

IE/RPRIB

NSIC

TB Branch

NRC PDR

NTIS

RPB-2

R. H. Brickley

C. E.-Johnson

Mrs. Juanita Ellis

David Preister

Mr. Richard Fouke