ML20054E520
| ML20054E520 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/28/1982 |
| From: | John Miller NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20054E521 | List: |
| References | |
| NUDOCS 8206110303 | |
| Download: ML20054E520 (2) | |
See also: IR 05000461/1982006
Text
_ ..
14
y"'
, Q 'e
-
-._
5
i
. > 41;
lE'HQ FitE COPY
,
,
'
-
'
-
%3
-
s
.
,
.
34
,
,
,
-
'
s
s
,
MAY 2 81982 '
N
l
' , ,
,
-
\\
<
1
5
Decket No. 50 _461
7
,
X
Illinois Power Company
NITN:
Mr. W. C. Gerstner
Executive Vice President
'
500 Sou'th_ 27th' Street
~
'
'
Decatur, IL 62525
,
Gentlemen:
s
This refers to the routine safety inspection conducted by Mr. R. A. Paul
of this ' office on April 28-30, 1982, of activities at Clinton Power Station,'
'
,
Unit 1, authorized by N7C Construction Permit No. CPPR-137 and to the dis-
,
cussion of our findings with you and members of your staff at the conclusion
of the inspection.
The enclosedic.opy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were adentified during the
course of this inspection.
i
s
\\
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
E
this letter and the enclosed inspection report will be placed in the NRC's
g'
Public Document Room.
If this report contains any information that you (or'
.
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4);
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention ~to file a request for
,
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seve.
')
days are available for your review, please notify this office promotly so
that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the
owner of the information which identifies the document or part sought to
be withheld, and which contains a full statement of the reasons which are
the bases for the claim that the information should be withheld from public
.
r
i
y
'
\\
.
s
,
- '3e1B;
s
ZEo &
8206110303 820528
'
PDR ADOCK 05000461
0
v
L
_
.
.
t
MAY 2 81982
Illinois Power Company
2
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld shall be incorporated as far as possible into a
separate part of the affidavit.
If we do not hear from you in this regard
within the specified periods noted above, a copy of this. letter and the'
enclosed inspection report will be placed in the Public Document Room.
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/J.R. Miller, Chief
/
Technical Inspection Branch
Enclosure:
Inspection Report /
No. 50-461/82-06(DETP)
cc w/ enc 1:
'
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
,
Randall L. Plant, Prairie
Alliance
,
'
//
RI
RII
RIII
- T'
ft
h
N' //j
'
au /ap
Greger
Walker
il r
5/26/82
j. 4