UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-293 BOSTON EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 56 to Facility Operating License ho. DPR-35 issued to Boston Edison Company (the ifcensee) which revised the Technical Specifications for operation of the Pilgrim Nuclear Power Station (the facility) located near Plymouth, Massachusetts. The amendment is effective as of its date of issuance.
The amendment incorporates limiting conditions for operation and surveillance requirements for safety relief valve discharge pipe temperatures and temperature monitoring instrumentation.
The application for the unendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since it does not involve a significant hazards consideration.
The Commission has determined that the issuance of the amendment will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of the unendment.
B 20 4 z3 0 596
2 For further details with respect to this action, see (1) the application for amendment dated February 19, 1982, (2) Amendment No.56 to License No.
~
DPR-35, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C., and at the Plymouth Public Library on North Street in Plymouth, Massachusetts 02360. A copy of items (2) and (3)
~
may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention: Director,, Division of Licensing.
Dated at Bethesda, Maryland this 20th day of March 1982.
FOR THE NUCLEAR REGULATORY COMMISSION
')
4
/kW Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing l
I I
I l
2
7590-01 l
t UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-293 BOSTON EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 56 to Facility Operating License No. DPR-35 issued to Boston Edison Company (the licensee) which revised the Technical Specifications for operation of the Pilgrim Nuclear Power Station (the facility) located rear Flymouth, Massachusetts. The amendment is effective as of its date of L
issuance.
l The amendment incorporates limiting conditions for operation and surveillance requirements for safety relief valve discharge pipe temperatures and temperature monitoring instrumentation.
The application for the amendment complies with the standards and requirenents of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since it does not involve a significant hazards consideration.
The Commission has determined that the issuance of the amendment will not result in any significant envirornental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of the amendment.
- 20 4 z3 0 596
-7
--,e-n---
2 For further details with respect to this action, see (1) the application for amendment dated February 19, 1982, (2) Amendment No.56 to License No.
DPR-35, and (3) the Commission's related Safety Evaluation. All of these items 5
are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C., and at the Plymouth Public Library on North Street in Plymouth, Massachusetts 02360. A copy of items (2) and (3)
[
may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention: Director.. Division of Licensing, Dated at Bethesda, Maryland this 20th day of March 1982.