Forwards IE Insp Repts 50-335/82-09 & 50-389/82-09 on 820301-05.No Noncompliance Noted
ML20054D982
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/25/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054D983 List:
References
NUDOCS 8204230564
Download: ML20054D982 (2)


See also: IR 05000335/1982009

Text

EhW

,

- .

MAR 251982

o

~

'

C

%

Florida Power and Light Company

3

RECEIVED

9

ATTN:

Dr. R. E. Uhrig, Vice President

-

-

Advanced Systems and Technology

!

gR 22 79826 Z

P. O. Box 529100

C

mang gays t

Miami, FL 33152

m*

13

//

Gentlemen:

,

,

N

Subject:

Report No

50-335/82-09 and 50-389/82-09

This refers to the routine safety inspection conducted by Mr. J. R. Wray of

this office on March 1-5,

1982, of activities authorized by NRC Operating

License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility and to the discussion of our findings held with Mr. C. M. Wethy,

Plant Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

3,04230 I

Q

'CEotNo

.

'

  • O

D

MAR 251982

Florida Power and Light Company

2

Enclosure:

Inspection Report Nos. 50-335/82-09

and 50-389/82-09

cc w/ enc 1:

C. M. Wethy, Plant Manager

N. Weems. Assistant QA

Construction Manager

B. J. Escue, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

i

RII

R::

RIIi

'

RII

'

RII

J

V

i

KD[dnis

@R@ ray:ht

K

rr

AFGibson

F

(3

i82

3/pf/82

3eg582

3/p /82

3/p /82