ML20054D889
| ML20054D889 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/05/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20054D890 | List: |
| References | |
| NUDOCS 8204230477 | |
| Download: ML20054D889 (2) | |
See also: IR 05000335/1982010
Text
!/f llCw
.
/
PR 5 1902
c
A
%
C
Florida Power and Light Company
k.
)
ATTN:
Dr. R. E. Uhrig, Vice President
2
APR 2 21982m- Z
Advanced Systems and Technology
u seum m a m m t
-
P. O. Box 529100
E
sum === a
Miami, FL 33152
g
&
Gentlemen:
1G
Subject:
Report Nos. 50-335/82-10 and 50-389/82-11
This refers to the routine safety inspection conducted by Mr. W. P. Ang of this
of fice on March 9-12, 1982, of activities authorized by NRC Operating License
No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie facility and
to the discussion of our findings held with Mr. C. M. Wethy, Plant Manager -
St. Lucie 1 and Mr. B. J. Escue, Plant Manager
.St. Lucie 2 at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
82 04 2 3 D T7 7
T Go(GU
Q
.
.
,
Florida Power and Light Company
2
"-y'
U a mn
e
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-335/82-10
and 50-389/82-11
cc w/ encl:
C. M. Wethy, Plant Manager
N. Weems, Assistant QA
Construction Manager
B. J. Escue, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
RII
)
RII
RI@IY
i
t. rw
WPAng:ht
ARHerdt
KLhndis
F ong
}/ b/82
N/0 /82
Q/1//82
l'ZJJ2