Forwards IE Insp Rept 50-416/82-13 on 820118-0216 & Notice of Violation
ML20054D855
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/03/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20054D831 List:
References
NUDOCS 8204230449
Download: ML20054D855 (2)


See also: IR 05000416/1982013

Text

-

V //w

-

.

i

1

  • 7 C

l (q

.

Mississippi Power and Light Company

ATTN: Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject: Report No. 50-416/82-13

This refers to the routine safety inspection conducted by Mr. A. G. Wagner, of

this of fice on January 18, to February 16, 1982, of activities authorized by NRC

Construction Permit No. CPPR-118 for the Grand Gulf facility.

Our preliminary

findings were discussed with Mr. C. K. McCoy, Plant Manager at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

f

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosured

report will be placed in the NRC's Public Document Room unless you notify this

office, by telephone, within ten days of the date of this letter and submit

written application to withhold information contained therein within thirty days

of the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

82042 3 0 W1

L

,

m

..

.'

hlAR 0 3 ;ggg

2

Shouli you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, flotice of Violation

2.

Inspection Report flo. 50-416/82-13

cc w/encls:

D. C. Gibbs, Vice President

liiddle South Energy, Inc.

C. K.11cCoy, Plant fianager

bcc w/encls:

fiRC Resident Inspector

Document lianagement Branch

State of Itississippi

RRI

RRI

RRI

RRI

a

A

din

er

FC

r 11

[

Ie

3/ / /82

3/ //82

3// /82

J/'L/82

Ng3