Forwards IE Insp Repts 50-335/82-05 & 50-389/82-04 on 820213-0310.No Noncompliance Noted
ML20054D795
Person / Time
Site: Saint Lucie  
Issue date: 03/25/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054D796 List:
References
NUDOCS 8204230392
Download: ML20054D795 (2)


See also: IR 05000335/1982005

Text

.

.

%

fff0W

-

MAR 2 51982

e

A

C

%

Florida Power and Light Company

p

RECElVED*

9

ATTN:

Dr. R. E. Uhrig, Vice President

-

-

Advanced Systems and Technology

. - -

APR 22;g826

-

s a m u I @* "' D

P. O. Box 529100

t,.

mma

iiiami, FL 33152

rec

Gentlemen:

'

5/82 N

05 and 50-389/82-04

Subject:

Report Nos.

_

This refers to the routine safety inspection conducted by Mr. S. A. Elrod of this

office on February 13 - March 10, 1982, of activities authorized by NRC Operating

License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility and to the discussion of our findings held with Mr. C. M. Wethy, Plant

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of- this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2,

Division of Project and

Resident Programs

Enclosure:

.

Inspection Report Nos. 50-335/82-05

and 50-389/82-04

,

cc w/ encl:

C. M. Wethy, Plant Manager

8204230 M1

Q

rEof Cp

.

.

+

MAR 2 51992

o

Florida Power & Light

2

N. Weems, Assistant QA

Construction flanager

B. J. Escue, Plant llanager

bec w/ encl:

NRC Resident Inspector

Document fianagement Branch

State of Florida

RII,[s)

RI-.[g]

RII j

RII

s

1

J

17

/

v

1

SE

ttit

KLdrld"is

FJLo g

Hanceh'

3//h82

3Mj/82

3/Zh/82

3/75/8