ML20054D183
| ML20054D183 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/07/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20054D184 | List: |
| References | |
| NUDOCS 8204220419 | |
| Download: ML20054D183 (2) | |
See also: IR 05000266/1982005
Text
3
c
.
.
.
.
, .
~
'APR 7
1982
nn
4
(o
C
i
Docket No. 50-266(DEPOS)
RECEWED.
Docket No. 50-301(DEPOS)
2-
APR 221h h
_
~
Wisconsin Electric Power Company
g spa shDWN f
ATTN:
Mr. Sol Burstein
W
y,
Executive Vice President
Power Plants
9
231 West Michigan
-:
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Drs. S. Rozak
and M. J. Destmann of this office on March 22-24, 1982, of activities at
the Point Beach Nuclear Power Plant, Units 1 and 2, authorized by NRC
Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion of our
findings with Mr. J. Zack and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
In addition, our Mobile Laboratory was at the site
during the inspection to perform independent measurements of radioactivity.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of this
letter a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7) days
are available for your review, please notify this office promptly so that a new
l
l
0204220419 820407
PDRADOCK05000g
gh
i,
1
e
.
.
e
i.
"
.
.
Wisconsin Electric Power Company
2
due date may be established. Consistent with Section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owaer of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons which are the bases for the claim
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we
do not hear from you in this regard within the specified periods noted above,
a copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
,
Sincerely,
t
<
l WC
. A. Hind, Director
Division of Emergency Preparedness
and Operational Support
Enclosure:
Inspection Reports
No. 50-266/82-05(DEPOS) and
No. 50-301/82-05(DEPOS)
cc w/ enc 1:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief Boiler
Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
Sandra A. Bast, Lakeshcre
Citizens for Safe Energy
0 *
f
RIII-
RIII
RIII
RIII
R
RIII
g
S/' .
-Q
"]g,tmann/so
w
L
Oes
Rozak
Sctu macher
ap r ello
dn -
I' y[j/
n<
l
4/1/82
97gb
of
f'2 -
'
l
~
. -