Forwards IE Insp Rept 50-346/82-03 on 820111-15 & Notice of Violation
ML20054D119
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/01/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20054D120 List:
References
TAC-48364, NUDOCS 8204220359
Download: ML20054D119 (2)


See also: IR 05000346/1982003

Text

.

- - .

.

. . = _ -

-- ..

--

..=

_

-.

-.. . .

--

- .

-

.

-

'

.

i

gg

. l?!?

,

!

W

A

,

l

C

!b

,

Docket No. 50-346(DETP)

F

p'

q

Toledo Edison Company

b

--

-

ATrN:

Mr. Richard P. Crouse

Y

oS

0

C

-

%

10

Vice President

5

4

l

Nuclear

p

)

Edison Plaza

4

ff

300 Madison Avenue

@\\

l

Toledo, OH 43652

~I

Gentlemen:

'

This refers to the routine safety inspection conducted by Messrs.

J. A. Grobe and R. Mendez of this office on January 11-15, 1982, of activi-

ties at the Davis-Besse Nuclear Power Station authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. T. Murray

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In addition to your response to the apparent items of noncompliance presented

in the Appendix, please provide the necessary information to demonstrate the

fire resistance qualifications of Door Nos. 206 and 311. This finding is ad-

dressed in more detail as Unresolved Item No. 50-346/82-03-03 in Paragraph 2

of the enclosed report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this-letter, the enclosures, and your response to this letter will be placed

in the NTC's-Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of-this letter has been

@)

B204220359 820401

PDR ADOCK 05000346

-

G

PDR

_ . . . _ . _ _ _ _ _ . _ . . _ _ _ _ _ _ _ . _ _ -_ _ _ _ _

_

.

. . .

_

. . _ _ _ _

.

.

!'

Toledo Edison Company

2

APR

1 1982

'

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity-

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorpcrated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

i

the specified periods noted above, a copy of this letter, the enclosures,

,

and your response to this letter will be placed in the Public Document

'

!

Room.

!

l

The responses directed by this letter (and the accompany 1ug Notice) are

not subject to the clearance procedures of the Office of Management and

i

f

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

!

l

We will gladly discuss any questions you have concerning this inspection.

'

t

l

Sincerely,

l

h ) p i t<> J c a w

C. E. Norelius, Director

Division of Engineering and

l

'

j

Technical Programs

i

'

i

Enclosures:

I

!

1.

Appendix, Notice

!

}

of Violation

i

l

2.

Inspection Report

No. 50-346/82-03(DETP)

!

!

'

cc w/encls:

,

l

T. D. Murray, Station

l

Superintendent

l

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

r

Harold W. Kohn, Power Siting

l

Commission

i

Helen W. Evans, State of Ohio

i

Robert M. Quillin, Ohio

j

Department of Health

j

i

RIII

.

RI I

K

)

RIII

RII

RII) f l

f

i)V

/t,

d

r

Gro e o

Mendez

Nelson

W 1 lams

Little

Norelius

3/20/82

M

!

I

__

--

-