ML20054D119
| ML20054D119 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/01/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20054D120 | List: |
| References | |
| TAC-48364, NUDOCS 8204220359 | |
| Download: ML20054D119 (2) | |
See also: IR 05000346/1982003
Text
.
- - .
.
. . = _ -
-- ..
--
..=
_
-.
-.. . .
--
- .
-
.
-
'
.
i
gg
. l?!?
,
!
W
A
,
l
C
!b
,
Docket No. 50-346(DETP)
F
p'
q
Toledo Edison Company
b
--
-
ATrN:
Mr. Richard P. Crouse
Y
oS
0
C
-
%
10
Vice President
5
4
l
Nuclear
p
)
Edison Plaza
4
ff
300 Madison Avenue
@\\
l
Toledo, OH 43652
~I
Gentlemen:
'
This refers to the routine safety inspection conducted by Messrs.
J. A. Grobe and R. Mendez of this office on January 11-15, 1982, of activi-
ties at the Davis-Besse Nuclear Power Station authorized by NRC Operating
License No. NPF-3 and to the discussion of our findings with Mr. T. Murray
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In addition to your response to the apparent items of noncompliance presented
in the Appendix, please provide the necessary information to demonstrate the
fire resistance qualifications of Door Nos. 206 and 311. This finding is ad-
dressed in more detail as Unresolved Item No. 50-346/82-03-03 in Paragraph 2
of the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this-letter, the enclosures, and your response to this letter will be placed
in the NTC's-Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of-this letter has been
@)
B204220359 820401
PDR ADOCK 05000346
-
G
_ . . . _ . _ _ _ _ _ . _ . . _ _ _ _ _ _ _ . _ _ -_ _ _ _ _
_
.
. . .
_
. . _ _ _ _
.
.
!'
Toledo Edison Company
2
APR
1 1982
'
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity-
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorpcrated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
i
the specified periods noted above, a copy of this letter, the enclosures,
,
and your response to this letter will be placed in the Public Document
'
!
Room.
!
l
The responses directed by this letter (and the accompany 1ug Notice) are
not subject to the clearance procedures of the Office of Management and
i
f
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
!
l
We will gladly discuss any questions you have concerning this inspection.
'
t
l
Sincerely,
l
h ) p i t<> J c a w
C. E. Norelius, Director
Division of Engineering and
l
'
j
Technical Programs
i
'
i
Enclosures:
I
!
1.
Appendix, Notice
!
}
of Violation
i
l
2.
Inspection Report
No. 50-346/82-03(DETP)
!
!
'
cc w/encls:
,
l
T. D. Murray, Station
l
Superintendent
l
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
r
Harold W. Kohn, Power Siting
l
Commission
i
Helen W. Evans, State of Ohio
i
Robert M. Quillin, Ohio
j
Department of Health
j
i
RIII
.
RI I
K
)
RIII
RII
RII) f l
f
i)V
/t,
d
r
Gro e o
Mendez
Nelson
W 1 lams
Little
Norelius
3/20/82
M
!
I
__
--
-