Forwards IE Insp Repts 50-373/82-17 & 50-374/82-02 on 820324-26.No Noncompliance Noted
ML20054D076
Person / Time
Site: LaSalle  
Issue date: 04/06/1982
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20054D077 List:
References
NUDOCS 8204220314
Download: ML20054D076 (2)


See also: IR 05000373/1982017

Text

F

\\

.

.

'APR 6

1982

cp

Q

Docket No. 50-373(DPRP)

c'

.p

Docket No. 50-374(DPRP)

C

3',

  1. ? gg

,

c.

<>

V fic '

.

Commonwealth Edison Company

y

m

_

4 '.4/

'

12

ATI'N :

Mr. Cordell Reed

c

-

8

hjb

Vice President

g

Post Office Box 767

qy

v

Chicago, IL 60690

N'

g,

l [

Co

Gentlemen:

This refers to the routine safety inspection conducted by Mr. H. M. Wescott

of this office on March 24-26, 1982, of activities at LaSalle County Nuclear

Station, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99

and No. CPPR100 and to the discussion of our findings with Mr. B. B. Stephenson

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

,

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

,

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)('), it is necessary that you (a) notify this office by tele-

phone within t u (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

11shed. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

l

8204220314 820406

. g () /

DRADOCK05000g

/

.

-

.

.

Commonwealth Edison Company

2

April 6, 1982

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further reouires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Acdy

i

R. C. Knop, Chief

Projects Branch 1

Enclosure:

Inspection Reports

No. 50-373/82-17(DPRP) and

No. 50-374/82-02(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

-

Assistant Attorney General

,

RIII

RIII

RIIf g'

09/ /In

f$$(

bN

d

Wescott/so

Whlker

4/2/82

k-6-O

KnopfgL

[

<

h

e

re-c