Requests Util Arrange Conference Call to Resolve Open Items Listed in Encl Control of Heavy Loads,Philadelphia Electric Co,Peach Bottom Atomic Power Station Units 2 & 3, Draft Technical Evaluation Rept
ML20054D016
Person / Time
Site: Peach Bottom  
Issue date: 04/05/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20054D017 List:
References
NUDOCS 8204220243
Download: ML20054D016 (2)


Text

'

Apart

  • 3M DISTRIBUIION_
  • receive enclosure
    • D5cket File) 0,4 L

TERA f1 SIC Dockets lios. 50-277 O

and 50-278 D

n O) 0, ELD CRS-10 Ce tir. Edward G. Bauer, Jr.

f4Fairtile 4Pgg % g g Vice President and General Counsel RIngram t

8tum Philadelphia Electric Company 230111arket Street Gray File

'# ri t

g*

F emenson Philadelphia, Pennsylvania 19101 9

G

Dear fir. Bauer:

4 ro Your letters of June 18 and December 22, 1981 responded to our request for additional information on the control of heavy loads at the Peach Bottom Station Unitt 2 and 3, dated December 22, 1980 Enclosed is a draft Technical Evaluation Report (TER) prepared for us by the Franklin Research Center under a technical assistance contract to the NRC. In order to complete our review we request that in four weeks from date of receipt of this letter that you arrange a conference call through your flRC Project flanager, to resolve open items listed th the draft TER. A representative of the FRC will participate in the conference call. He intend to issue a Safety Evaluation on control of heavy loads which will be based on a final TER to be issued by FRC after this conference call.

Sincerely, "R.n3.151g;gggZ "G E. S?O ay John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Draft Technical Evaluation Report cc w/ enclosure:

See next page i

8204220243 820405 l

PDR ADOCK 05000277 l

P PDR v to 2

'n vt omen....DRBM : DL.......L DRSM:.0L.

rya.irt.i..l.ncf.aS\\ g

.... - - ~ ~

........ - - ~..

, sum o

$!.2-l.82.........

...Al.. l..........

onn

.... - ~ ~. ~..

~ ~... ~. ~.....

- -. ~. - ~ ~ -

pc ronu ais omeo) uncu oua OFF1CIAL RECORD COPY usom --nwa

Philadelphia Electric Company cc w/ enclosure-Eugene J. Bradley Philadelphia Electric Company Assistant General Counsel 2301 Market Street Philadelphia, Pennsylvania 19101 Troy B. Conner, Jr.

1747 Pennsylvania Avenue, N.W.

M. J. Cooney, Superintendent Washington, D. C.

20006 Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Government Publications Section State Library of Pennsylvania Education Building Commonwealth and Walnut Streets Harrisburg, Pennsylvania 17126 Philadelphia Electric Company ATTN: Mr. W. T. Ullrich Peach Bottom Atomic Power Station Delta, Pennsylvania 17314 Curt Cowgill U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Peach Bottom Atomic Power Station P. O. Box 399 Delta, Pennsylvania 17314 Mr. Ronald C. Haynes, Regional Administrator U. S. Nuclear Regulatory Commission, Region I Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 l

p KECg

.[.

Ig UNITED STATES

! j j v.cf;'. ;g NUCLEAR REGULATORY COMMISSION k,. # f, [E WASHINGTON, D. C. 20555

  • \\ v(

April 5,1982 Dockets Nos. 50-277 and 50-278

/i i

Mr.EdwardG.\\Bauer,Jr.

Vice President \\and General Counsel Philadelphia Electric Company 2301 Market StrSet Philadelphia, Pe' nsylvania 19101 n

\\

Dear Mr. Bauer:

Your letters of June 18 and December 22 /1981 responded to our request for additional informa' tion on the control of heavy loads

& the Peach Bottom Station Units 2 'and 3, dated Ddcember 22, 1980. enn osed is a draft Technical Evaluatido Report (JER) prepared for us by tne Franklin Research Center u'nder a technical assistance contract to the NRC.

In order to complete our re/iew we request that in four weeks from date of receipt of this\\lett'er that you arrange a conference call through your NRC Project Managef, to resolve open items listed in the draft TER. A representative of\\the FRC will participate in the conference call. We intend to issue a Safety Evaluation on control of heavy loads which will be basedxon a final TER to be issued by FRC after this conferencejcall.

'N

/

\\

/

Sincerely, l14\\ - T N. 2.

/

~

\\

~

j

/

,Joh.h F. Stolz, Chief)

/

!0perating' Reactors Branch #4

/

Division ofxLicensing

\\

Enclosure:

N Draft Technical

\\

Evaluation Report

\\

cc w/ enclosure:

See next page

\\

\\