Text
,
.
.
pm . o FUi COPY
po
.
.
APR 2 1982
\\
. .jE
N
Docket No. 50-237(DETP)
If.
7 .g[
'A
Docket No. 50-249(DETP)
,~;
gge
_
a
Au
o
.g/
-
h
\\
I
Commonwealth Edison Company
kO
' d
ATTN:
Mr. Cordell Reed
C
G ,/ /g
j\\
Vice President
T2
Post Office Box 767
--
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. A. Paul
of this office on February 18 through March 2, 1982, of activities at
Dresden Nuclear Power Station, Units 2 and 3, authorized by NRC Operating
Licenses No. DPR-19 and No. DPR-20 and to the discussion of our findings
with Mr. Scott and members of your staff at the conclusion of the
inspection.
The inspection was an examination of activities conducted under your license
as they, relate to radiation safety and to compliance with the Commission's
rules and regulations and with the conditions of your license. The inspec-
tion consisted of a selective examination of procedures and representative
records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
DMa:fff
8204210231 820402
PDR ADOCK 05000237
f f
,
G
j
.
.
.
.
Commonwealth Edison Company
2
APR
2 1932
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possibic into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
kb
h
G. W. Roy, Acting Chief
Technical Inspection Branch
Enclosure:
Inspection Reports
No. 50-237/82-05(DETP) and
No. 50-249/82-05(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIJI,
RIII
RIII
RI 13
klh
[)h
h'ks
" }b[^
Paul /so
Greger
Walkdttl
Roy
3/31/82
'///