JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1982 There were three (3) automatic shutdowns, (one (1) continued from 2/28/82), in the month of March.

The following safety-related maintenance was performed in the month of March:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired packing leaks on safety-related valves.
3. Removed circuit ground in CCW Heat Exchanger Room Sump Pump 16A.
4. Repaired evaporator concentrate discharge orifice flange leak.
5. Replaced and adjusted limit switches on safety-related valves.

1 1

8204200433 820412 PDR R

ADOCK 05000364 PDR

OPERATING DATA R EPORT DOCKET NO. _50-364 DATE .4/05/82 CO.\1PLE1 LD llY M_liairston , III TELEPilONE (205) 899-5156 OPER A IING STAl US

1. Unit Name: Joseph M. Farley - Unit 2 N"I
1) Cumulative data
2. Reporting Penod: March. 1982 since 7/30/81, date of
3. Licensed l hennal Power t'.1Wr P 2652 commercial operation.
4. Nameplate Rating (Gross $1WeP 860
5. Desien Ilettrical Rating (Net alWer 829
6. Staumum Dependable Capacity (Grow S1We): 854.7
7. 51asimum Deptmlable Capacity (Net 51We): 813.7
8. Il Changes Occur in Capacity Ratings (Itenn Number 3 Through 71 Since Last Report. Gise Reasons:

N/A

9. Power Lcui lo Which Restricted. lf Any (Net 51We): N/A
10. Reawns for l{estrictions. If Any: N/A lhis hionth Yr.-to Date Cumulatise i1. ilours in Reporting Period 744 2.160 5.881
12. Number Of flours Reactor Was Critical 705.6 1,461.9 5,142.1
13. Reactor Resene Shutdown llunrs 38.4 62.9 103.7
14. Ilours Generator On l.ine 696.9 1.383.7 5.050.2
15. Unit Resene Shutdown flours 0 0 0
16. Gross Ibermal Energy Generated (51Wih 1.541 170 3:259 176 12,725:333 17 Grow Electrical Energy Generated (%IWill 488.732__ ,. 1.043.436 4,114,814 IN. Net Lieetrical Energy Generated ( A1Wil) 459.902 975.618 3.896.338
19. Unit Senice l' actor 93.7 64,1 85.9
20. Unit Asailabdity Factor 93.7 64.1 85.9
21. Unit Capacity I actor 1(Nne NIDC Net t 76.0 55.5 81.4
22. Unit Capacity Factor (Using DER Net) 74. 6 54.5 79.9
23. Unit forced Ontane Rate 6.3 35.9 14.1
24. Shutdowns Scheduled Oser Next 6 N!nnths ( Type. Date..md Duration of Each t N/A 25 If Shut Down 1: End Of Report Period. litimated Date of Startup: N/A
26. Units in lest Status tPrior to Conunercul Operation P Foreent Achiesed INill A L CRI TIC A LI TY 5/06/81 5/08/81 INillAL LEI CIRICITY 5/24/a1 5/25/81 CO\l\ll RCI A L OPER A IlON 8/01/81 7/30/81 U3/77)

- - DOCKET NO. 50-364

.*w s

, UNIT J. M. Farlev-Unit 2 DAE 4/07/82 C05fPLETED BY W.C. Hairston , III

/ TELEFl!ONE (205) 899-5156 310NT11 March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIL POWER LEVEL (5lWe Net) (5tWe Net) g 0 17 174' 2 300 -

gg 175 3 616 g9 463 4 676 ;g 797 5 673 21 809 6 672 22 816 7 682 23 316 g 693 ;4 813 9 694 23 818 10 694' 26 803

- 33 694 n 813 32 670 23 828 ,

g3 737 ,

3 826 g.g 750 30 349 15 362 3g 806 16 .

107 .

INSIEUCliONS On this form:t. list the avenge dady unit power levelin MWe Net for each d:y in the reporting month. Compute to

, the nease t wh. .e nr;2 watt.

. (9(77)

s. ,

e k

i i r ~~

'f%

(

(\.

V

-h&.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J . M. Farlev-Unit 2 DATE 4/05/82 REPORT MONTig March, 1982 COMPLETED BY W.G. Hairston, III TELEPIIONE (205) 899-5156 l

u

":.=

c No. Date g

.$ E 5g

};; jYi jj5 Licensee Eg jg Cause & Corrective H

Event p Q Action to 3: 5 ji2g Report a _

mU g Prevent Recurrence 5

004 820228 -F 21.9 A 3 NA CH Pump XX Continued outage due to reactor trips caused by the cycling of the 2A MFP miniflow and a failure in the DEH System.

005 820315 F 19.7 A 3 NA HB Instru Reactor trip - Turbine trip - caused by an intermittent ground in the

?SIV controls.

006 820330 F 5.5 A 3 NA CH Pump XX Unit tripped due to a "B" steam generator feedpump trip.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G . Instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry St.ects for Licensee C-Refueling 3 Automatic Scram.

D-Regulatory Restriction Event ReporI (LER) File (NUREG.

4-01her (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain)

(9/77) Il-Other (Explain) Exinbit 1.Same Source