JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS MARCH, 1982 There were three (3) automatic shutdowns, (one (1) continued from 2/28/82), in the month of March.
The following safety-related maintenance was performed in the month of March:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repaired packing leaks on safety-related valves.
3.
Removed circuit ground in CCW Heat Exchanger Room Sump Pump 16A.
4.
Repaired evaporator concentrate discharge orifice flange leak.
5.
Replaced and adjusted limit switches on safety-related valves.
1 1
8204200433 820412 PDR ADOCK 05000364 R
OPERATING DATA R EPORT DOCKET NO. _50-364 DATE.4/05/82 CO.\\1PLE1 LD llY M_liairston, III TELEPilONE (205) 899-5156 OPER A IING STAl US
- 1. Unit Name:
Joseph M.
Farley - Unit 2 N"I 1) Cumulative data
- 2. Reporting Penod:
March. 1982 since 7/30/81, date of
- 3. Licensed l hennal Power t'.1Wr P 2652 commercial operation.
- 4. Nameplate Rating (Gross $1WeP 860
- 5. Desien Ilettrical Rating (Net alWer 829
- 6. Staumum Dependable Capacity (Grow S1We):
854.7
- 7. 51asimum Deptmlable Capacity (Net 51We):
813.7
- 8. Il Changes Occur in Capacity Ratings (Itenn Number 3 Through 71 Since Last Report. Gise Reasons:
N/A
- 9. Power Lcui lo Which Restricted. lf Any (Net 51We):
N/A
- 10. Reawns for l{estrictions. If Any:
N/A lhis hionth Yr.-to Date Cumulatise i1. ilours in Reporting Period 744 2.160 5.881
- 12. Number Of flours Reactor Was Critical 705.6 1,461.9 5,142.1
- 13. Reactor Resene Shutdown llunrs 38.4 62.9 103.7
- 14. Ilours Generator On l.ine 696.9 1.383.7 5.050.2
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Ibermal Energy Generated (51Wih 1.541 170 3:259 176 12,725:333 17 Grow Electrical Energy Generated (%IWill 488.732__,.
1.043.436 4,114,814 IN. Net Lieetrical Energy Generated ( A1Wil) 459.902 975.618 3.896.338
- 19. Unit Senice l' actor 93.7 64,1 85.9
- 20. Unit Asailabdity Factor 93.7 64.1 85.9
- 21. Unit Capacity I actor 1(Nne NIDC Net t 76.0 55.5 81.4
- 22. Unit Capacity Factor (Using DER Net)
- 74. 6 54.5 79.9
- 23. Unit forced Ontane Rate 6.3 35.9 14.1
- 24. Shutdowns Scheduled Oser Next 6 N!nnths ( Type. Date..md Duration of Each t N/A 25 If Shut Down 1: End Of Report Period. litimated Date of Startup:
N/A
- 26. Units in lest Status tPrior to Conunercul Operation P Foreent Achiesed INill A L CRI TIC A LI TY 5/06/81 5/08/81 INillAL LEI CIRICITY 5/24/a1 5/25/81 CO\\l\\ll RCI A L OPER A IlON 8/01/81 7/30/81 U3/77)
DOCKET NO.
50-364
.*w s
UNIT J. M.
Farlev-Unit 2 DAE 4/07/82 C05fPLETED BY W.C. Hairston, III
/
TELEFl!ONE (205) 899-5156 310NT11 March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAIL POWER LEVEL (5lWe Net)
(5tWe Net) g 0
17 174' 2
300 gg 175 3
616 g9 463 4
676
- g 797 5
673 21 809 6
672 22 816 7
682 316 23 g
693
- 4 813 9
694 23 818 694' 26 803 10 694
- 33 n
813 32 670 23 828 g3 737 826
,3 349 g.g 750 30 15 362 3g 806 16 107 INSIEUCliONS On this form:t. list the avenge dady unit power levelin MWe Net for each d:y in the reporting month. Compute to
, the nease t wh..e nr;2 watt.
(9(77) s.
e k
i
-h&
i r ~~
'f%
(\\.
(
V UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME J. M.
Farlev-Unit 2 DATE 4/05/82 REPORT MONTig March, 1982 COMPLETED BY W.G. Hairston, III TELEPIIONE (205) 899-5156 l
u
=
c
.$ E
}
jYi Licensee Eg jg Cause & Corrective No.
Date g
5g jj5 Event p
Q Action to H
3:
5 ji2g Report a g
Prevent Recurrence mU 5
004 820228
-F 21.9 A
3 NA CH Pump XX Continued outage due to reactor trips caused by the cycling of the 2A MFP miniflow and a failure in the DEH System.
005 820315 F
19.7 A
3 NA HB Instru Reactor trip - Turbine trip - caused by an intermittent ground in the
?SIV controls.
006 820330 F
5.5 A
3 NA CH Pump XX Unit tripped due to a "B" steam generator feedpump trip.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry St.ects for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (LER) File (NUREG.
D-Regulatory Restriction 4-01her (Explain) 0161)
E-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exinbit 1.Same Source (9/77)
Il-Other (Explain)