Text
f
~
^
.
,
<
.
,
FILE COPY
.
.
gg
o 3.
N
&
Docket No. 50-440(DETP)
D
SEcgj ED
Docket No. 50-441(DETP)
b
9
p dJ$g
-
The Cleveland Electric Illuminating
Company
%
~
ATfN: Dalwyn R. Davidson
%
0
Vice President - System
q,
Engineering and Construction
4
Post Office Box 5000
%
m
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. K. D. Ward
and E. Nightingale of this office on February 23-26, and March 8-10, 1982,
of activities at the Perry Nuclear Power Plant, Units 1 and 2, authorized by
NRC Construction Permits No. CPPR-148 and No. CPPR-149 and to the discussion
of our findings with Mr. M. Edelman at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
-
t
0204200257'820406
PDR ADOCK 05000
p
G
~
__-_ _
.
. - _ .
r
.
-
.
.
.
6iM
The Cleveland Electric Illuminating
2
APR
Company
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
lbl
b
bl bam % v
lNL
D C. E. Norelius, Director
Division of Engineering and
"
Technical Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-440/62-03 and
No. 50-441/82-03
cc w/encls:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
liarold W. Kohn, Power Siting
Commission
Daniel D. Wilt, Attorney
llelen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
RIII
RII
RII
RIIIp/
RIII
I
/LYV
/
); W
j
r i
Vetd/jp
gale
f
nielson
in
Little
No elius
j
3/26/82
(V
y[-
'
\\
,