ML20054B875
| ML20054B875 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 04/13/1982 |
| From: | Parker W DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| TASK-1.A.3.1, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-TM GL-82-05, GL-82-5, NUDOCS 8204190273 | |
| Download: ML20054B875 (2) | |
Text
.
\\
. C DUKE POWER COMPANY Powen Duttouxo 422 Sourn Cnuncu STnEET, CHAuwTTE, N. C. asa sa April 13, 1982 wiwam o. panaca Ja-VICF Patsiotut TELEPMoNc:Anta 704 SitAM Paoouction 373-4083 S
Mr. Harold R. Denton, Director RECggyg Office of Nuclear Reactor Regulation
/;
,1 APR IG 7982h '-I U. S. Nuclear Regulatory Commission g "ygN
/
Washington, D. C.
20555 Toc Attention:
Ms. E. G. Adensam, Chief p
b Licensing Branch No. 4 h
Re: McGuire Nuclear Station Docket Nos. 50-369 NRC Generic Letter 82-05
Dear Mr. Denton:
Attached is Duke Power Company's response for McGuire Nuclear Station to NRC Generic Letter 82-05 transmitted by Mr. Darrel G. Eisenhut's letter of March 17, 1982.
Please advise if there are any questions regarding this response.
trulyyours[-
Ver
_ 0. / std w
William O. Parker, J.
GAC/j fw Attachment cc:
Mr. P. R. Bemis Mr. James P. O'Reilly, Regional Administrator Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 thrietta Street, Suite 3100 Atlanta, Georgia 30303 Si; 8204190273 820413 PDR ADOCK 05000369 P
d McGuire Nuclear Station Response to Generic Letter 82-05 Item Requirement Date Completed I.A.3.1 Include simulator exams in licensing Prior to March 1979 -
examinations Has always been a Duke requirement.
II.B.2 Modify facility to provide access to January, 1981 vital areas under accident conditions II.B.3 Install post accident sampling capability December, 1981 11.B.4 Complete training for mitigating core June, 1981 damage II.E.1.2 Modify auxiliary feedwater instrumenta-February, 1981 tion to safety grade II.E.4.2 Part 5 - Lower containment pressure set-No change made, point to level compatible with normal Existing setpoint operation acceptable.
Part 7 - Isolate purge and vent valves Prior to March 1979.
on radiation signal Function is part of plant design.
II.F.1 (1) Install noble gas effluent monitors May, 1981 (2) Provide effluent monitoring of iodine May, 1981 (3) Install extended range containment May, 1981 radiation monitors (4) Install extended range containment February, 1981 pressure indication (5) Provide indication of containment January, 1981 water level (Upgrade of existing system completed)
(6) Install continuous indication of H2 lby, 1981 concentration in containment
__,