ML20054B534

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-13 on 820315-19 & 22-26.No Noncompliance Noted
ML20054B534
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 04/01/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20054B535 List:
References
NUDOCS 8204160579
Download: ML20054B534 (2)


See also: IR 05000373/1982013

Text

F

.

.

'APR 1

082

l /

t-\\

g\\

Oy

S'

U

EOdDfED

Docket No. 50-373(DPRP)

y

-

Commonwealth Edison Company

1 Rl '5 7982hIt

'

'

'

ATrN:

Mr. Cordell Reed

,;puerm[#

rp*Wrs

Vice President

5-

Post Office Box 767

h

M

Chicago, IL 60690

%j

,

Gentlemen:

This refers to the routine safety inspection and March 19, 1982, Management

Meeting conducted by Messrs. L. A. Reyes, N. Chrissotimos, R. N. Gardner,

and K. D. Ward of this office on March 15-19, 22-26, 1982, of activities at

LaSalle County Nuclear Station, Unit 1, authorized by NRC Construction Permit

No. CPPR-99 and to the discussion of our findings with Mr. R. H. Holyoak at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

l

(

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

,

l

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

l

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

l

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

11shed. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

0

) 'C

8204160579 820401

/

/

PDR ADOCK 05000373

G

PDR

,

r

.

.

Commonwealth Edison Company

2

APR 1

082

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

gfc 4r

~

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosure:

Inspection Report

No. 50-373/82-I3(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

I

!

i

i

!

RIII

/

RIII

RIII

RI I

RIII

RIII

RIII

l

RIIIjY' Y

hg~V

-

h

,G Y

ft(

}Y

Wh

'

&

'

t

Reyes/ o Chrissoti s

Gardner

Wand

j{6orelius Walk 4r

Knop

Spessard

3/30/82

Il54V

,

,

,

!