Proposed Tech Specs Re Energizing Single Control Assembly Mechanism
ML20054B086
Person / Time
Site: Crane 
Issue date: 04/08/1982
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20054B085 List:
References
NUDOCS 8204160314
Download: ML20054B086 (1)


Text

.-

SURVEILLANCE REQUIREMENTS BOROJ CONCENTRATION 4.1.1.2 The reactor coolant shall be determined to be within its limits by:

a.

Determining the baron concentration of the primary coolant to be between 3000 and 4500 ppm by:

1.

A mass balance calculation at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

A chemical analysis at least once per 7 days.

b.

Verifying the primary coolant temperature to be greater than 500F at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.1.3 C0i4 TROL ASSEMBLIES CONTROL MECHANISM ENERGIZATION 4.1.3.1 The control rod drive mechanism shall be verified deenergized at least once per 7 days except when single mechanisms are energized in accordance with NRC approved procedure (s) and Technical Specification 3.1. 3.1.

Any energized control rod drive mechanism shall be verified deenergized within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after completion of any rod movement tests.

THREE MILE ISLAND - UNIT 2 4.1-3 PROPOSED 8204160314 820408 PDR ADOCK 03000320 P