Interim Deficiency Rept Re Crimped Terminal Lugs in Main Control Panels,Initially Reported 820126.Rework Plan Developed for Main Control Panels,Auxiliary Relay Racks & Local Control Stations.Final Rept Will Be Submitted 820805
ML20054A495
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/08/1982
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KMLNRC-82-186, NUDOCS 8204150500
Download: ML20054A495 (1)


Text

KANSAS GAS AND ELECTRIC COMPANY e A ooa t norses= 8 D

.....,n..... m...

p GECENs 9 5 APRI4 Igg y 3 April 8, 1982

.A c$lE $ $ f h T:CC Mr. W.C. Seidle, Chief 4 -

Reactor Projects Branch 2 g d

U.S. Iluclear Regulatory Commission

  • N, '

Region IV \

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 3gf,,*M---a*

}

Ll i4+. APR I 2 1982L!)B 2 KMLt1RC 82-186 ij\i!_____

Re: Docket No. STIl 50-482 {' ,

Ref: Letter KMLilRC 02-166 dated 2/26/82 from ' -

GLKoester, KGE, to GLMadsen, flRC Subj: Interim 10CFR50.55(e) Report - Terminal Lugs in Main Control Panels, Auxiliary Relay Racks and Local Control Stations

Dear Mr. Seidle :

On January 26, 1982, a telephone report was made to Mr. W.A. Crossman regarding suspect crimped terminal lugs in the main control panels at Wolf Creek Generating Station. The above-referenced letter provided an interim report on this pot.ential 10CFR50.55(e) item. On April 1, 1982, a telephone report was made to Mr. R.E. Hall advising that additional suspect crimped terminal lugs have been found in the auxiliary relay racks and local control stations furnished by the same vendor. During this telephone report it was agreed that these additional suspect lugs would be included in the 10CFR50.55(e) report.

A rework plan has been developed for the main control panels, auxiliary relay racks and local control stations. This plan includes an inspection and replacement, if necessary, of all lugs used in the safety-related circuits in question.

To this date we have not established whether or not the imperfectly crimped lugs, if left uncorrected, would have significantly affected safety.

The status of this rework program or a final report will be submitted on or before August 5, 1982. In the interim, please direct any questions on this matter to me or to Mr. Otto Maynard of my staff.

Yours very truly, u; a / >

GLK:bb /uh V $ '

cc: Mr. Thomas Vandel 8204150500 820408 nU PDR ADOCK 05000482 S .P, D R,,sa av... . a.ne. ..,v a sa . ,,-aress PO Box 208 i Wichita. Kansas 67201 - Telephone- Area Code (316) 2616451