ML20054A481

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1982
ML20054A481
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/15/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20054A482 List:
References
NUDOCS 8204150489
Download: ML20054A481 (1)


Text

  • .

Southern California Edison Company 15, 1 S AN ONOFRE NUC L E AR GENER A TING S T A TION

~

S AN C LEME N T E, C A LIF ORNia 92672 H B. RAY 8 E""0NE s u rio~ ~ ANao a March 15, 1982 gg g " "2 ""

9- -

APR Director  : -

?419 essmaa,ff;pe,8& 7e Office of Management Information and L a%r ePU7t Program Analysis J U. S. Nuclear Regulatory Conmission O Washington, D. C. 20555 m Docket flo. 50-361 San Onofre Unit No. 2 Gentlemen:

Enclosed is the data required by Technical Specification Section 6.9.1.10 for the San Onofre Nuclear Generating Station, Unit 2.

Please contact us if we can be of further assistance.

Sincerely,

/A/ .

Enclosures cc: Director, Region V Office of Inspection and Enforcement L. Miller - USNRC Inspector 1'f9A g i

8204150489 820315 PDR R ADOCK 05000361 PDR

- , - _ - .