b MAINE YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 82-2 FOR TIIE MONTH OF FEBRUARY,1982 8204150282 820312 DR ADOCK 05000309 PDR

o L

OPERATING DATA REPORT DOCKET NO. 50-309 DATE 820312 COMPLETED BY A.F.

Onvie TELEPHONE 617-872-6100-X2390 OPERATING STATUS Maine Yankee Notes

1. Unit Name:

February, 1982

2. Reporting Period:

p

3. Licensed Thermal Power (MWr).

2630 stem flow h@ M M 864

4. Nameplate Rating (Gross 31We):

essue Mhe.

825

5. Design Electrical Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7J Since Last Report. Give Reasons:
9. Power Level To Which Restricted.If Any(Net MWe):

835 MWe (W7%)

10. Reasons For Restrictions.If Any:

See notes This Month Yr. to.Date Cumulative

11. Hours in Reportin2 Period 672.00 1,416.00
12. Number Of Hours Reactor Was Critical 650.70 1.394.70 66.303.34
13. Resetor Resene Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On Line 641.00 1.385.00 64.095.63
15. Unit Resene Shutdown Hours 0.00 0.00 0.00
16. GrossThermal Energy Generated (MWH) 1.548.243.00 3.436.924.00 139.530.154.00
17. Gross Electrical Energy Generated (MWH) 50? 670.no 1.116.490.00 45.786.240.00
18. Net Electrical Energy Generated (MWH) 478.623.00 1.064.074.00 43.507.340.00
19. Unit Service Factor 95.39 97.81 78.57
20. Unit Availability Facto -

95.39 97.81 78.57 87.93 92.77 68.46

21. Unit Capacity Factor t' ag MDC Net) 86.33 91.09 66.38
22. Unit Capacity Factor (L ng DER Net)
23. Unit Forced Outage Rate 4.61 2.19 6.90
24. Shutdowns Scheduled Over Nest 6 Months (Type.Date.and Duration of Each1:

Scheduled tnaintenance shutdown from March 5 to March 15. 1982.

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\l%IERCIAL OPERATION

'(0/77)

J

o AVERAGE DAILY UNIT POWER LEVEL

^

DOCKET NO.

50-309 UNIT Maine Yankee t

DkTE 820312 COMPLETED BY A.E. Doyle 617-872-8100-X2390 TELEPHONE MONTH FEBRifARY_ f9A9 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe Neti 790 I

37 32g 792 2

18 699 790 39 787 3

791 4

797 20 87 796 21 5

670 790 6

22 789 763 23 7

8 24 792 789 790 25 795 9

793 792 10 26 783 713 11 27 792 357 12 28 675 13 29 644 14 30 705 3g IS 347 16 INSTRUCTIONS On this format, list the aserage daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

UNITSilUIDOWNS AND POWER REDUCTlONS DOCKET NO.

50-309 UNIT NAME Maine Yankee DATE 820312 REPORT MONTig FEBRUARY, 1982 COMPLETED itY A.E.

Dovle TELEPil0NE 617-872-8100-X2390 "E

c ei 3

-a S

.E _:-

g

,5X L.icensee c%

g%

Cause & Corteetive Nie.

Date g

g g

,3 g 5 Event n?

93 Action su

$2 cE j;5 Report #

iN0 0

Prevent itecurrence Q

L.R.to 820206 F

28.8 B

NA NA HF HTEXCll-D Load reduction to investigate C1' 80%

inleakage in condenser bay "A".

L.R.to 820213 F

69.0 B

NA NA HF HTEXCH-D j"LoadreductiontoinvestigateCl-80%

inleakage in waterboxes "A",

"B",

C" and "D".

1-82-6 820216 F

11.6 A

3 NA IE INSTRU-S Automatic unit shutdown initiated while performing DC ground isolation procedures.

820216 F

33.3 A

NA NA Increasing power at reduced load.

2-82-6 820217 F

9.7 A

3 NA HJ ACCUMU While increasing power at reduced load, automatic unit shutdown due to high heater drain tank level.

I 2

3 4

F: Furied Iteason:

Method:

Extiibit G - Instructions S: Scheduled A Equipment F.iilure (Explain) 1-Mai.ual for l'acparation of Data 11 Maintenance of Test 7 Manual Scram.

Entry Shecis for Licensee C itefuelin :

3 Autumatic Scram.

Evens Iteport (LElt) Fde INUllEG-D Hegulainiy Resisiction 4-Other (Explain) 0161) li Operator Tsaining1 License Examination I! Administiative G Operational I.n.n (limpl in)

Exhibil 1 Same Sonsee Pl/17) 11 Othes (Empt.ain)

=

UNITS!!UTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-309 UNIT NAME Maine Yankee DATE o n119 REPORT MONTil FEBRUARY. 1982 COMPLETED 11Y

-_A.E.

Dovle TELEPl10NE 617-872-8100-X2390 I

I

.! ?

)

..Yk Licensee

,E g Cause & Corrective No.

Dale R

E ij 3sE Event 8]

~g e-Action to H

jE 5

~gc Report #

in U

~;

Prevent Itceurtence

.O e

Q 3-82-6 820227 F

9.7 A

2 NA HH INSTRU-S Manual unit shutdown initiated due to P-2B automatic trip caused by failed low suction pressure switch.

820228 F

16.8 A

NA NA Increasing power at reduced load.

I 2

3 F: Fort ed Iteason:

4 Method:

S: Scheduled A IItinipment Failure (Explain) l-Manual Exhibit G. Instructions B. Maintenance of Test for Picparation of Data 7 Manual Scrain.

Entry Sheets for Licensee C Itcrueling 3 Automatic Scram.

Event Itepost (Llilt) File INUltEG.

D Regulatony itestriction 4-Other (Explain) 0161)

E Ope ator Training & License Examination F Ailministeative G Ope:ational 1.irus (linpl.iin) 5 19/77)

Il Othes (limpl sin)

Exhihit I. Same Source

DOCKET NO.

50-309 UNIT Maine Ya'nkee DATE 820312 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 REPORT MONTH FEBRUARY, 1982 SU?tlARY OF OPERATING EXPERIENCES The plant was at full power at the beginning of the month.

On February 6th, a load reduction to 80% was completed to investigate Cl-inleakage f rom waterboxes "A" and "B".

The plant returned to full power on February 7th.

On February 13th, a load reduction to 80% was completed to sequentially check all waterboxes for C1 inleakage.

The plant returned to full power on February 16th.

On February 16th, a reactor trip resulted when an automatic turbine trip was initiated while performing D'J ground isolation procedures.

On February 17th, while at 30% power, and attempting to start a heater drain pump, the reactor and turbine were automatically tripped due to a high Heater Drain Tank level. The plant returned to full power on February 18th.

On February 27th, the reactor and turbine were manually tripped when P-2B steam generator feed pump tripped due to a failed low suction pressure switch.

The plant was returning to full power at the end of the month.