ML20053E883

From kanterella
Jump to navigation Jump to search
Forwards NEDO-22139, Core Spray Sparger Crack Analysis at Peach Bottom Atomic Power Station,Unit 2. Rept Provides Completed Technical Analysis Supporting Continued Safe Operation of Unit
ML20053E883
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/04/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20053E884 List:
References
NUDOCS 8206100173
Download: ML20053E883 (1)


Text

.

l e

  • D PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A, PA.19101 SHIE LDS L. DALTROF F stac'r=ErnoEc son June 4, 1982 Docket No. 50-277 Mr. J.

F.

Stolz, Chief Operating Reactors Branch #4 Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz :

By letter dated May 11, 1982 (J. W.

Gallagher, PECO to J.

F.

Stolz) we forwarded a discussion of the significance of the cracks found in the Peach Bottom Unit 2 Core Spray Sparger.

The attached document, NEDO-22139 " Peach Bottom 2 Core Spray Sparger Crack Analysis" provides the completed technical analysis performed by General Electric Company in support of the continued safe operation of the unit.

The ongoing refueling outage is currently scheduled for completion on June 14, 1982, therefore your prompt consideration of these matters would be greatly appreciated.

If there are any questions, please contact us.

Very truly yours, N

l

//.

Mul Attachment cc:

R. C. Haynes, Administrator - w/o attachment C. J. Cowgill, Site Inspector

- w/o attachment A

r2061oo173 e206o4 0

PDR ADoCK 05000277 P

PDR