MAY 2 61992
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of
this office on May 18 and 19, 1982, of activities at Byron Station, Units 1
and 2, authorized by NRC Construction Permits No. CPPR-130 and No. CPPR-131
and to the discussion of our findings with Mr. M. Stanish and others at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you (or
your contractors) believe to be exempt from disclesure under 10 CFR 9.5(a)(4),
it is necesaary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of this
letter a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7)
.:
days are available for your review, please notify this office promptly so
8206100133 820526
gO[
_
PDR ADOCK 05000454
O
____
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
.
Al4Y26 g
Commonwealth Edison Company
2
that a new due date may be established. Consistent with Section 2.790(b)(1),
any such application must be r.ccompanied by an affidavit executed by the
owner of the information whi.:h identifies the document or part sought to be
withheld, and which contair.s a full statement cf the reasons which are the
bases for the claim that t'ne information should be withheld from public
disclosure. This section further requires the s atement to address with
specificity the consideratior.s listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
id.J MdA
b/
0,
g
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Reports
No. 50-454/82-09(DETP) and
No. 50-455/82-06(DETP)
4
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Karen Borgstadt, Office of
Assistant Attorney General
Myron M. Chbrry
3ff
RIII[
RIII
RI
RIII
f0
dk
ard/so
fanielson
Knop
Little
5/24/82
_