ML20053E854

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-454/82-09 & 50-455/82-06 on 820518-19.No Noncompliance Noted
ML20053E854
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/26/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20053E855 List:
References
NUDOCS 8206100153
Download: ML20053E854 (2)


See also: IR 05000454/1982009

Text

__

-____

______

_ _ _ _ - _

.

.

MAY 2 61992

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward of

this office on May 18 and 19, 1982, of activities at Byron Station, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-130 and No. CPPR-131

and to the discussion of our findings with Mr. M. Stanish and others at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclesure under 10 CFR 9.5(a)(4),

it is necesaary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

If

your receipt of this letter has been delayed such that less than seven (7)

.:

days are available for your review, please notify this office promptly so

8206100133 820526

gO[

_

PDR ADOCK 05000454

O

PDR

____

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

.

Al4Y26 g

Commonwealth Edison Company

2

that a new due date may be established. Consistent with Section 2.790(b)(1),

any such application must be r.ccompanied by an affidavit executed by the

owner of the information whi.:h identifies the document or part sought to be

withheld, and which contair.s a full statement cf the reasons which are the

bases for the claim that t'ne information should be withheld from public

disclosure. This section further requires the s atement to address with

specificity the consideratior.s listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

id.J MdA

b/

0,

g

W. S. Little, Chief

Engineering Inspection Branch

Enclosure:

Inspection Reports

No. 50-454/82-09(DETP) and

No. 50-455/82-06(DETP)

4

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Karen Borgstadt, Office of

Assistant Attorney General

Myron M. Chbrry

3ff

RIII[

RIII

RI

RIII

f0

dk

ard/so

fanielson

Knop

Little

5/24/82

_