e
? %,,$)
'.$ E'lW
' N :n..,
Southern California Edison Company J
S A N OfeOF RE NUC L E A R GE NE R A TING S T A TION p
P.O. D o m 1211 S A N C LEME N T E, C A LIF CR Nie 92472 0, [ ((.
H. B. R A'/
T E L E PHONE
$ f A 1 s O N M A N ". G E. A i1146492?700 June 1, 1982 U. S. Nuclear Regulatory Commission Cffice of Inspection and Enforcement Regien V 1450 f' aria Lane, Suite 210 Wainut Creek, California 94596 - 5368 Attention:
Mr. R. H. Engelken, Regional Administrator
Dear Sir:
Subject:
Docket No. 50-206 LER No.82-009 San Onof a Nuclea1 Ceneratinc Statico, Unit 1
References:
1)
Letter, H. B. Ray (SCE) to R. H. Eng21 ken (NRC),
Prcept R2 port Concerning Weld Feilures on Feecuater System Pipe Supports, dated April 5, 1932.
2)
Letter, H. B. Ray (SCE) to R H. Engeiken (NRC),
Fourtuan Day Report Concerning Weld Failures on Feein ter System Pipe Supports, dated April 16, 1932.
TFis letter is a folicw-up report to References 1 ard 2 which involve the failure of four feedwa.er system pipe sunports.
In Reference 2 ne indicated that a final report on this matter would ce submitted cy Jur.e 1, 1932; however, sevaral npects of this situation remain to be completed.
As a rn u i t of a conversation with Mr. Dennis Kirscn of your of f"ce en May 25, 1922, it has been decided to sC;ait this interim report, with the final report to be forwarded to you on or about July 1, 1932.
l Tch S
l P206100078 820601 PDR ADOCK 05000206 S
d C8 R.H. Engellen June 1, 1932 Reference 2 icentified two corrective actions as 1) perf ormance of a matallurgical analysis of all four supports and 2) replacement of the failed supports. A rretallurgical aralysis of on2 of the f311ed pipe supports considered typical of all four has b'en cccplowd nd has Ird to the r
conclusion that excus:.h:> si&;i se movtre rt of the ter.-inch fecdsator line r;sulted in fatipe cracking of the pipe suppcrt.
Replacer. cat of the failed supports is underway.
TFe fir:al report on this natter will be submitted on or about July 1, 1932.
Sincertly, HT)f l '11thw cc:
U. S Nucicar Regulatory Commission Office of Inspection and Enforcement U. 5. Nucicar Regulatory Cctroission Office of Man % ment Information and Progra"1 Control (iiiPC)
Institute of Nuclear Power Operations (INPC)
L F. Miller - (USNRC Resident Ir.spector - San Onofre Unit 1) l l