Forwards IE Insp Repts 50-424/82-06 & 50-425/82-06 on 820211-0310 & Notice of Violation
ML20053E369
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/12/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelley R
GEORGIA POWER CO.
Shared Package
ML20053E352 List:
References
NUDOCS 8206070836
Download: ML20053E369 (2)


See also: IR 05000424/1982006

Text

r

i

.

.

ellocD

-

-

-

'

gpg 1 '21982

Georgia Power Company

ATTil:

Mr. R. J. Kelley, Jr.

Executive Vice President

P. 0. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject:

Report ilos.

24/82-0 and 50-425/82-06

This refers to the routine safety inspection conducted by fir. W. F. Sanders of

this office on Fe'ruary 11 - March 11,1982, of activities authorized by NRC

Construction Permi' Nos. CPPR-108 and CPPR-109 for the A. W. Vogtle facility.

Our preliminary findings were discJssed with Mr. H. H. Gregory, III, Construction

Project Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspaction report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elenents to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this lettet. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

0me_

F. J. Long, Acting Chief

Reactor Projects Branch 2,

Division of Project and

Resident Programs

Enclosure:

(See page 2)

e206070836 020521

PDR ADOCK 05000

o

.

. .

.,

.

,

APR A& 1982.

Georgia' Power Company

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/82-06

and 50-425/82-06

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

bec w/ encl:

NRC Resident Inspector

Document Management. Branch

State of Georgia

WS(anders:dt!f W

RIYI -

RII,

RII

RII4

Ilh

h

JRogge

VBrownlee

FLong

3/g/82

3/

/82

1

//1/82

3/ /82

2

N

4(5

h?