Georgia Power Company
ATTil:
Mr. R. J. Kelley, Jr.
Executive Vice President
P. 0. Box 4545
Atlanta, GA 30302
Gentlemen:
Subject:
Report ilos.
24/82-0 and 50-425/82-06
This refers to the routine safety inspection conducted by fir. W. F. Sanders of
this office on Fe'ruary 11 - March 11,1982, of activities authorized by NRC
Construction Permi' Nos. CPPR-108 and CPPR-109 for the A. W. Vogtle facility.
Our preliminary findings were discJssed with Mr. H. H. Gregory, III, Construction
Project Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspaction report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elenents to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this lettet. Such application must be consistent with the requirements
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
0me_
F. J. Long, Acting Chief
Reactor Projects Branch 2,
Division of Project and
Resident Programs
Enclosure:
(See page 2)
e206070836 020521
PDR ADOCK 05000
o
.
. .
.,
.
,
APR A& 1982.
Georgia' Power Company
2
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/82-06
and 50-425/82-06
cc w/ encl:
H. H. Gregory, III, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. O. Foster, Project General Manager
bec w/ encl:
NRC Resident Inspector
Document Management. Branch
State of Georgia
WS(anders:dt!f W
RIYI -
RII,
RII
RII4
Ilh
h
JRogge
VBrownlee
FLong
3/g/82
3/
/82
1
//1/82
3/ /82
2
N
4(5
h?