ML20053E209

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-546/82-09 & 50-547/82-09 on 820401-30.No Noncompliance Noted
ML20053E209
Person / Time
Site: Marble Hill
Issue date: 05/24/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20053E210 List:
References
NUDOCS 8206070697
Download: ML20053E209 (2)


See also: IR 05000546/1982009

Text

r --

p

.

.

MAY 2 4 1982

Docket No. 50-546

,

Docket No. 50-547

Public Service of Indiana

A*lTN:

Mr. S. W. Shicids

Senior Vice President

Nuclear DJvision

Post Office Box 190

New Washington, IN 47162

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. J. Harrison

of this office on April 1-30, 1982, of activities at Marble Hill Nuclear

Generating Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with

Messrs. Petro, Ramsett, and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representc;4ve records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

1

'

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclocsure under 10 CFR 9.5(a)(4), it is necessary

>

.

that you (a) notify this office by telephone within ten (10) days from the

!

date of this letter of your intention to file a request for withholding;

and (b) submit within twenty-five (25) days from the date of this letter

I

a written application to this office to withhold such information.

If

your receipt of this letter has been delayed such that less than seven (7)

,

days are available for your review, please notify this office promptly so

<

that a new duc date may be established. Consistent with Section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the

owner of the information which identifies the document or part sought to

be withheld, and which contains a full statement of the reasons which are

the bases for the claim that the information should be withheld from

i

@206070697 820524

PDR ADOCK 05000546

. $t: C/

,_

G

PDR

- - - - ,

-

_

__ _

. - - . _ _ _

_

_

_

._

..

.

.

Public Service of Indiana

2

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter and

the enclosures will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J. F. Streeter, Chief

Projects Branch 2

Enclosure:

Inspection

Reports No. 50-546/82-09(DPRP)

and No. 50-547/82-09(DPRP)

cc w/ enc 1:

W. M. Petro, Executive Director

Nuclear Project Management

C. Kammerer, CA

J. H. Sniezek, IE

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of Attorney

General

>

John R. Galloway, Staff Director

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley Power

Association

Thomas M. Dattilo, Save the Valley

4

t

i

RIIk

,-

RIII

)t II

/

q %3

nd in/jp

S(reeter

Spe ward

5/17/8

y

g

wpsh

1

,

c Q B g' *

,-

,

,

i

ess it

g

/

/

__ ._,