Interim Deficiency Rept Re Potential Link Rod Deficiency in Standby Diesel Generators,Initially Reported on 811125.Insp to Be Conducted During Engine Crankshaft Deflection Testing. Final Rept Due by 821210
ML20053D996
Person / Time
Site: Perry  
Issue date: 05/28/1982
From: Davidson D, Evan Davidson
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Keepler J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-20(80), NUDOCS 8206070511
Download: ML20053D996 (1)


Text

- ---- ---- -.

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O DOx ' X4 e et EVEL AND. OHIO 44101 e TELEPHONE !?fu 622 9800 e ILLUMINATING OLDG e 55 PUBLIC SOUARE A

Serving The Best Locatan in the Nation Dalwyn R. Davidson May 28, 1982 wet on cwa svsn u towm ocor Ano constauction Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440, 50-441; Standby Diesel Generators, Potential Link Rod Deficiency

[RDC 20(80)]

Dear Mr. Keppler:

As stated in our correspondence to you dated November 25, 1981, an inspection was to be conducted to evaluate a potential link rod deficiency in the Standby Diesel Generators supplied by Transamerica Delaval to the Perry Nuclear Power Plant Project. A final report outlining the results of this inspection and proposed corrective action was to be submitted to you by June 1, 1982.

It was determined by the Perry Project Organization that this inspection will again be conducted during engine crankshaft deflection testing. This activity has again been rescheduled due to delays delays in the completion of diesel engine installation.

It is now estimated that this inspection will be completed by December 1, 1982, and our final report on this subject will be submitted by December 10, 1982.

Very truly yours, a/.

Dalwyn R. Davidson Vice President System Engineering and Construction DRD:pab cc:

Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 8206070511 020528 UN IN PDR ADOCK 05000440

/

O S

PDR

,/ N-

,o