Forwards IE Insp Repts 50-338/82-12 & 50-339/82-12 on 820421-22.No Noncompliance Noted
ML20053D843
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/11/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20053D844 List:
References
NUDOCS 8206070377
Download: ML20053D843 (2)


See also: IR 05000338/1982012

Text

n--

fCll09.l

. - -

.

.

MAY 11 1982

Virginia Electric and Power Company

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Subject:

Report Nos. 50-338/82-12, 50-339/82-12

This refers to the routine safety inspection conducted by Mr. N. Economos of this

office on April 21-22, 1982, of activities authorized by NRC License Nos. NPF-4

and NPF-7 for the North Anna facility and to the discussion of our-findings held-

with Mr. J.

R.-

Harper, Maintenance Superintendent, at the conclusion of the

inspection.

11

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of tnis ' letter and submit written

application to. withhold information contained therein within' thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

As/

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8206070377 820511

PDR ADOCK 05000338

G

PDR

ZEol

c

.

.

.

Virginia Electric and Power Co.

2

!AY l i 1982

Enclosure:

Inspection Report Nos. 50-338/82-12,

50-339/82-12

cc w/ encl:

P. G. Godwin, Director, Nuclear Security

J. H. Fei guson, Executive

.

Vice President

W. R. Cartwright, Station Manager

W. C. Spencer, Vice President

Power Station Engineering and

Construction Services

P. G. Perry, Site Manager

E. LiFrage, Project Coordinator

bec w/ encl:

Document Management Branch

Commonwealth of Virginia

NRC Resident Inspector

C D[l"6

h,1)

RPh

RII

RII

i

it

'

l

f

,

tN

nomos:es

ARHerdt

KDLandis

HCDance

y

,

5//e/82

f/3////82

5/n /82

5 /p /82

,

.