ML20053D421

From kanterella
Jump to navigation Jump to search
Application to Amend DPR-16,consisting of Tech Spec Change Request 106,requesting one-time Annotation to Definition of Refueling Outage to Extend Time Between Successive Tests or Surveillances Not to Exceed 30 Months.Related Info Encl
ML20053D421
Person / Time
Site: Oyster Creek
Issue date: 05/28/1982
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20053D422 List:
References
NUDOCS 8206040413
Download: ML20053D421 (7)


Text

___

GPU Nuclear NQQI f

100 Interpace Parkway Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number:

May 28, 1982 Director Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Subj ect:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Technical Specification Change Request No. 106 In accordance with 10 CFR 50.59 and 10 CFR 50.90, GPU Nuclear Corporation operator of the Oyster Creek Nuclear Generating Station, Provisional Operating License No. DPR-16 request a change to Appendix A of the Oyster Creek Technical Specifications.

  • echnical Specification Change Request No. 106 requests a one time only nnotation to the definition of Refueling Outage (Section 1.12).

Prior to the cycle 10 refueling outage only, the definition shall be annotated to extend the time between successive tests or surveillances from not exceeding 20 months to not exceeding 30 months.

It is our intention that this change request does not affect the interpretation of section 1.24 " Surveillance Requirements" which grants f

"A maximum allowable extention not to exceed 25% of the surveillance l

interval."

The Technical Specification Change Request has been reviewed and approved by the Director, Station Operations, the Plant Operations Review Committee, and an Independent Safety Review Group in accordance with Section 6.5 of the Oyster Creek Technical Specifications.

We have d e t e rm ined that this submittal is Class III per 10 CFR 107.22 and will enclose a check for $4000 pursuant to that section by separate letter.

If additional information is required, please contact Jim Knubel, Manager, BWR Licensing, at (201) 299-2164.

^goof Very truly yours, J

P Vice Presiderat and 8206040413 820528 Director - Oyster Creek PDR ADOCK 05000219 i

p PDR 1r I

Enclosures GPU Nuclear is a part of the General Pubhc Utilities System

-