ML20053C932

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-352/82-06 on 820315-0423.No Noncompliance Noted
ML20053C932
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/12/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20053C933 List:
References
NUDOCS 8206030184
Download: ML20053C932 (2)


See also: IR 05000352/1982006

Text

--___ -

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _

,

.

MAY Ig 1982

Docket No. 50-352

.

Philadelphia Electric Company

ATTN:

Mr. John S. Kemper

l

Vice President

Engineering and Research.

2301 Market Street

Philadelphia, PA 19101

Gentlemen:

Subject:

Inspection No. 50-352/82-05

This refers to the routine safety inspection conducted by Mr. R. A. McBrearty

of this office on March 15 - April 23, 1982 at the Limerick Generating Station,

Unit 1, Limerick, Pennsylvania of activities authorized by NRC License No.

CPPR-106 and to the discussions of our findings held by Mr. McBrearty with Mr.

P. K. Pavlides of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative recoros,

interviews with personr.el, and observations by the inspector.

In addition, our Mobile NDE Laboratory was also brought to your site and used

by the inspectors to make certain independent examinations. The purpose of

~

  • ,

these examinations is to assess the adequacy of your quality control program

through our independent examination of items previously accepted under your

program.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

i

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

.

of 2.790(b)(1).

The telephone notification of your intent to request withholding,

l

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

OFFICIAL RECORD COPY

d

82R60 K)184 820512

\\

PDR ADOCK 05000352

,\\

g

PM

g

. _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.-

...

. - -

-

--

.

.

,

!

Philadelphia Electric Company

2

No reply to this letter is required. 'Your cooperation with us in this matter

"

is appreciated.

'

Sincerely,

Original Signed By:

-

)dhomasT. Martin, Director

'

) Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report Number 50-352/82-06

-.

cc w/ encl:

V. S. Boyer, Senior Vice President, Nuclear Power

,

l

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Branch (w/o encl)

E. C. McCabe

.!

RI:DqEPU

Rl:DETP

McBrearty/wb

Ebn qgV

5/10/82

.g

0FFICIAL RECORD COPY

,

I

.

.

._.

. . . . . . -

-

. - - .