ML20053C760
| ML20053C760 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 05/26/1982 |
| From: | Oprea G HOUSTON LIGHTING & POWER CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ST-HL-AE-835, NUDOCS 8206020540 | |
| Download: ML20053C760 (3) | |
Text
- - -
The Light Company n~m usimw>.,m m n,x mi u-,ii.m,,mmumsmn May 26, 1982 ST-HL-AE-835 SFN: V-0100
~ ~ ~ ~ ~
Mr. John T. Collins
}
i Regional Administrator, Region IV Nuclear Regulatory Conmission 611 Ryan P1aza Dr., Suite 1000
(
g g g Arlington, Texas 76012
Dear Mr. Collins :
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Fourth Interim Report Concerning Heating, Ventilation and Air Conditioning Design On May 8,1981, pursuant to 10CFR50.55(e), Houston Lighting & Power Company (HL&P) notified your office of an item concerning the consideration of certain faulted condition heat loads in the design of portions of the Heating, Ventilation and Air Conditioning (HVAC) system.
Based on an assessment of preliminary thermal environmental data, it was identified that certain spaces and cubicles within the Mechanical-Electrical Auxiliary Building (MEAB) and the Fuel Handling Building (FHB) will likely require additional HVAC capacity.
A conceptual design based on the aforementioned preliminary data was previously developed by Brown & Root, Inc. (B&R) and fomarded to HL&P for consideration.
In addition, in order to expedite resolution of this item, two consultants were engaged by B&R to perform system review, evaluation and design recommendation activities. The reports by the consultants have been received by B&R and transmitted to Bechtel Power Corporation (BPC) as part of the transition activities. BPC is presently in the process of perfonning a detailed review of the South Texas Project (STP) HVAC design (including these areas of concern) as part of transition work packages EM-550, 551, 552, 553 and 555.
The consultants reports will be incorporated in BPC's review.
In our third interim report, HL6P identified that upon completion of the review by BPC, a schedule would be transmitted to your office.
Currently, BPC anticipates' completion of the HVAC work package activity by mid-September 1982.
In our next interim report, HL&P~will p~ ovide a program description and r
/,Y
- p,.
8206020540 820526
/
I I
PDR ADOCK 05000499 6
S PDR
_________________-__________a
i
"'"I""I May 26, 1982 Fourth Interim Report Concerning ST-HL-AE-835 Heating, Ventilation and Air Conditioning SFN: V-0100 Page 2 l
schedule of necessary activities which will include revising as necessary, the l
appropriate design criteria documents and verifying the HVAC equipment performance parameters.
The next interim report concerning this item will be submitted to your office by October 18, 1982.
If you should have any questions concerning this item, please contact Mr. M. E. Powell at (713) 877-3281.
Very r y ours,
/
r.
Ex tive' ce President MEP/kr i
Houston Lighting & Power Company cc:
G. W. Oprea, Jr.
May 26, 1982 J. H. Goldberg ST-HL-AE-835 J. G. Dewease SFN: V-0100 J. D. Parsons Page 3 D. G. Barker C. G. Robertson R. A. Frazar J. W. Williams J. W. Briskin J. E. Geiger R. L. Ulrey S. M. Dew J. T. Collins (NRC)
D. E. Sells (NRC)
W. M. Hill, Jr.
(NRC)
M. D. Schwarz (Baker &Botts)
R. Gordon Gooch (Baker & Botts)
J. R. Newman (Lcwenstein, Newman, Reis, & Axelrad)
STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chainnan, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livennore Laboratory P. O. Box 177i University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermere, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 04-19-82
._ _ _ _ _