Reconfirms & Updates Info Previously Provided 820426 Re NUREG-0737 Items Per NRC 820317 & 0505 Ltrs.Status Encl
ML20053C682
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/26/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-1.C.1, TASK-1.D.1, TASK-1.D.2, TASK-2.B.1, TASK-2.B.2, TASK-2.D.1, TASK-2.F.2, TASK-2.K.3.30, TASK-2.K.3.31, TASK-3.A.1.2, TASK-3.A.2.2, TASK-3.D.3.4, TASK-TM GL-82-10, NUDOCS 8206020461
Download: ML20053C682 (5)


Text

WNSCORSin Electnc mwca couesur 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 May 26, 1982 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. D. G. Eisenhut, Director Division of Licensing Gentlemen:

DOCKET NOS. 50-266 AND 50-301 RESPONSE TO GENERIC LETTER 82-10 POST-TMI REQUIREMENTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Mr. Eisenhut's letter of May 5, 1982 to all operating power reactor licensees enclosed a listing of those NUREG-0737 items not previously addressed in the NRC's March 17, 1982 letter and requested schedule commitments to implement those items. In tnose cases where a licensee's schedule extended beyond the lUREG-0737 schedule, licensees were further requested to provide a justification for the schedule and a description of compensatory measures being taken in the interim.

On April 26, 1982, in response to the March 17 NUREG-0737 schedule letter, Wisconsin Electric submitted an updated schedule requirements and implementation status letter for all of the NUREG-0737 items. That letter addresses each of those items identified in the enclosure to your May 5 letter. However, for your convenience, we have prepared a separate listing as an attachment to this letter which reconfirms, and in a few cases further updates, the information which has been previously provided to you.

h S

8206020461 820526 PDR ADOCK 05000266 P PDR

Mr. H. R. Denton May 26, 1982 We would be pleased to respond to any questions you may have regarding this schedule information or the accompanying explanatory information.

! Very truly yours,

  1. ,d-Assistant Vice Fresident C. W. Fay Attachment Copy to NRC Resident Inspector Subscrib d and sworn to before me thisg[, day of May 1982.

W!& kv ^m Notary PtO51ic, Sta'te of Wisconsin My Commission expires d //f3/

e y -

l i

l i

i

-r -

~. _- _ __ _

ATTACHMENT NUREG-0737 ITEMS SCHEDULED AFTER MARCH 1, 1982 Wisconsin Electric Item Schedule Discussion P

I.A.l.3.1, September 1, 1982 The PBNP approved procedure will be revised Limit Overtime to reflect the policy statement issued with Generic Letter 82-02.

I.A.l.3.2, ---

The schedule and discussion for this item Minimum Shift Crew has been provided in a separate letter to Mr. Eisenhut dated May 19, 1982.

I.C.1, To Be Determined Although the schedule for revised emergency Revised Emergency procedures promulgated in NUREG-0737 required Procedures implementation by the first refueling after 1/1/82, we understand that the Commissioner's are presently considering a revised imple-mentation schedule for this item under the topic of SECY 82-111, " Requirement for Emergency Response Capabilities". Apparently, Commission action on this document is scheduled for June 1982. We will respond to the results of this Commission action when the revised implementation schedule has been published.

I.D.1, To Be Determined No reply requested at this time. See Note Control Room Design I.D.1 to April 26, 1982 letter.

Review I.D.2, March 1, 1984 No reply requested. PENP schedule is SPDS projected based on timely delivery of equipment.

Wisconsin Electric Item Schedule Discussion II.B.1, January 1, 1984 No reply requested. Note II.B.1 enclosed l RCS Vents with our April 26, 1982 letter explains this item further.

II.B.2.3, January 1, 1984 No reply requested. Note II.B.2.3 enclosed Plant Shielding with our April 26, 1982 letter explains Environmental this item further Qualification II.D.l.2, July 1, 1982 As discussed in Wisconsin Electric's RV and SV Test letter to Mr. Denton dated April 8, 1982,

! Program in accordance with the NRC's letter dated September 29, 1981, the plant-specific final evaluation shall be submitted by July 1, 1981.

II.D.l.3, Not Applicable Reports are to be provided to the Block Valve Test NRC later this year that justify and Program substantiate the decision that a block valve test program is not necessary.

II.F.2, January 1, 1984 No reply requested. PBNP schedule is Instrumentation for projected based on timely delivery of Inadequate Core equipment.

Cooling II.K.3.30 and 3.31, To Be Determined See discussion in notes II.K.3.30 and SB LOCA Analysis II.K.3.31 provided with our April 26, 1982 letter.

III.A.l.2, ---

The schedule and discussion for this item Staffing for has been provided in a separate letter to Emergencies Mr. Eisenhut dated May 19, 1982.

Wisconsin Electric -

Item Schedule Discussion .

III.A.1.2, ---

The schedule and plans for meeting the Upgrade Emergency requirements of this item have been Support Facilities provided previously. The table with our April 26, 1982 letter lists these references.

III.A.2.2, --- The schedule and plans for this item have Meteorological Data previously been provided with our letter to Mr. Denton dated December 29, 1981.

III.D.3.4, January 1, 1983 Additional information is provided in Control Room note III.D.3.4 provided with our April 26, Habitability 1982 letter.