Interim Deficiency Rept Re Spalling on Underside of Unit 2 Auxiliary Bldg 401-ft Elevation Floor Slab,Initially Reported on 820423.Calculations Performed by Sargent & Lundy to Ensure Reinforcing Steel Integrity.Next Rept by 820723
ML20053C634
Person / Time
Site: Marble Hill
Issue date: 05/24/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 582-08, 582-8, S82-8, SVP-0028-82, SVP-28-82, NUDOCS 8206020410
Download: ML20053C634 (1)


Text

PUBLIC SERVICE INDIANA May 24, 1982 S. W. Shields S82-08 Senu V,ce Presi<fent '

SVP-0028-82 Nucle.v Division Mr. James G. Keppler Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On April 23, 1982, Mr. S. J. Brewer of Public Service Company of Indiana, Inc.

(PSI) notified your of fice of a potentially reportable item as required by 10 CFR 50.55(e) . This item pertained to the discovery of spalling at one location on the underside of the 401 ft. elevation floor slab in the Unit 2 Auxiliary Building. Examination of the affected surface indicated the spalling was due to aggregate shear failure and not unsound concrete.

The probable cause of the concrete spalling was the movement of a 4100 Manitowac crane over tSe affected area. Calculations by PSI's architect -

engineer, Sargent & Lundy indicate that while the force exerted by the crane was great enough to spall the concrete, stress in the reinforcing steel was not sufficient to damage the steel. Any remaining spalled or cracked concrete will be removed from this area and an inspection of the reinforcing steel will be made to ensure its integrity has not been impaired. The method of repair of this area will be determined subsequent to this inspection.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before July 23, 1982. If you have any questions on this report, please feel free to contact me.

J

Sincerely, 4 a
'[

vec No tL

$O S. W. Shields NO TG/kdh (D C O cc: Director of Inspection and Enforcement g U.S. Nuclear Regulatory Commission Washington, D.C. 20555 a

no 04 m

Q J. E. Konklin g2g g (D o.ul J. J. Harrison P. O Box 190, New Washington, Indiana 47162 812. 289.3000

- - - _ . _ __ _ _ _ _ _ _. - _._ _ _ _ _ _, . . _ , _ _ _ , _ _ __ _ . _ _ , _