ML20053C450

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures EPIP 1.1 Re Initial Classification, EPIP 1.3 Re Estimation of Source Term & EPIP 1.4 Re Radiological Dose Evaluation
ML20053C450
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/04/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20053C448 List:
References
NUDOCS 8206020169
Download: ML20053C450 (3)


Text

_-

1 Wisconsin Electnc paara cou?>ur 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE. WI 53201 May 4, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention. Mr. R. A. Clark, Chief Operating Reactors, Branch 3

Dear Mr. Denton:

DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are ten copies of the following revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures:

PROCEDURES

1. EPIP 1.1, " Initial Classification", Revision 2, dated 04/30/82.
2. EPIP 1.3, " Estimation of Source Term", Revision 1, dated 04/30/82.
3. EPIP 1.4, " Radiological Dose Evaluation", Revision 1, dated 04/30/82.
4. EPIP 1.5, " Protective Action Evaluation", Revision 3, dated 04/30/82.
5. EPIP 1.7, " Evaluation of Core Damage", Revision 0, dated 04/30/82.
6. EPIP 1.8, " Emergency Off-Site Dose Estimations",

Revision 0, dated 04/30/82.

)(oof 3

7. EPIP 6.1, " Limited Plant Evacuation", Revision 1, dated 04/30/82.

/ (O

8. EPIP 7.1.1, " Chemistry & Health Physics Group Personnel Notification and Initial Response When Chemistry &

Health Physics Personnel are on Site", Revision 2, dated 04/30/82.

8206020169 820525 PDR ADOCK 05000266 F PDR

=" w

Mr. Harold R. Denton May 4, 1982

9. EPIP 7.4.1, " Routine Check, Maintenance, Calibration

& Inventory Schedule for Health Physics Emergency Plan Equipment", Revision 5, dated 04/30/82.

10. EPIP 7.4.2, " Emergency Plan Equipment Routine Check, Maintenance and Calibration Instructions", Revision 3, dated 04/30/82.
11. EPIP 8.1, " Personnel Assembly and Accountability",

Revision 2, dated 04/30/82.

12. EPIP 11.3, " Hospital Assistance", Revision 1, dated 04/30/82.
13. EPIP 12.2, " Personnel Exposure & Search and Rescue

! Teams", Revision 2, dated 04/30/82.

14. EPIP 15.3, " Drills & Exercises", Revision 2, dated 04/30/82.

FORMS 7

1. EPIP-17, (04-82), " Accounting Short Form". (Attach to EPIP 8.1)
2. EPIP-24a (04-82), " Site Boundary Control Center Emergency Plan Inventory Checklist". (Attach to l EPIP 7.4.1)

L l 3. EPIP-24b (04-82) , "TSC, ESC, South Gate & OSC Emer-gency Plan Inventory Checklist". (Attach to EPIP 7.4.1)

4. EPIP-24e (04-82), " Emergency Vehicle Inventory Check-I list". (Attach to EPIP 7.4.1)
5. EPIP-25b (04-82), " Monthly Health Physics Instrument

& Air Sampler Functional Test Checklist". (Attach to EPIP 7.4.2)

6. EPIP-25c (04-82), " Quarterly Emergency Plan Checklist".

(Attach to EPIP 7.4.2)

7. EPIP-25d (04-82), " Semi-annual and Annual Emergency Plan checklist". (Attach to EPIP 7.4.2)
8. EPIP-32 (04-82), " Search & Rescue and Emergency (Attach to EPIP 12.2) l Operations Checklist".
9. EPIP-33 (04-82), " Estimation of Core Damage". (Attach to EPIP 1.7) l i

i

s .a Mr. Harold R. Denton -

3- May 4, 1982

10. EPIP-34 (04-82), "

Calcuation cf Xe-133 Equivalent Release Rates". (Attach to EPIP 1.8)

11. EPIP-35 (04-82), "

Dose Calculations". (Attach to EPIP 1.8)

MISCELLANEOUS

1. " Table of Contents" dated 04/30/82.
2. " Table of EPIP Forms" dated 04/30/82.

These revisions consist of page changes which should be filed in your copies of the Emergency Plan Implementing Procedures in accordance with the attached instructions. Please return the reccipt form for these ten copies to:

Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours,

'/ s

& J,6 C. W. Fay Assistant' Vice President Enclosures Copies to NRC Resident Inspector (1)

Incident Response Center, Region III (3) i r

l 4

++,-w -

7 y - e- - e - ~-- - - - -