ML20053C380
| ML20053C380 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 05/21/1982 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8206020031 | |
| Download: ML20053C380 (4) | |
Text
_
DISTRIBUTION:
v( f / scu,/
D cument control (50-373)
W 21 R LB#2 Reading sg
}
NRC PDR y
.ti E C " iV E D {
L P.DR d
NS iDocket Nos. '50-373 j
,g( g 7ggg, 3 p
'i uin h ae** mm EHyl ton E"
//
ABournia CSkovholt Mr. Louis 0. DelGeorge Director of Nuclear Licensing
,4 CWoodhead, OELD I&E Commonwealth Edison Company ACRS (16)
P. O. Box 767 Region III Chicago, Illinois 60690
Dear Mr. DelGeorge:
Subject:
Interpretation of Technical Specification - Reporting Requirements when Special Reports Are Indicated in Action Statements - La Salle County Station, Unit No. 1 In Commonwealth Edison's letter dated April 24, 1982, it was requested that we review the interpretation that Commonwealth has made and provide you with our interpretation relative to the L a Salle Technical Specifications in which action statements such as:
"If the system is not returned to operable within days, in lieu of any other report required by Specification 6.6 A or 6.6 B, prepare and submit to the Commission within 30 days, pursuant to Specification 6.6 C, a Special Report outlining certain information. The provisions of Specification's 3.0.3 and 3.0.4 are not applicable."
It was indicated that Commonwealth Edison Company interprets thir wording to mean that if the system is inoperable but is restored to operation within the speciffed time period in the action statement, no report pursuant to Specification 6.6 C to the NRC it required.
If the system is not returned to operable within the specified time period, a Special l
Report shall be submitted within the specified time frame in lieu of any otner report required by Specification 6.6 A or 6.6 B.
We agree with i
your interpretation.
i Sincerely, A. Schwencer, Chief 8206020031 820521 Licensing Branch No. 2 l
PDR ADOCK 05000373 Division of Licensing
'\\
P PDR cc: See next page
_ - SEE NEXT PAGE FOR PREVIOUQ CONCURRENCES DL. :..L.B..#2../..P. M.
.D..S. T : L..G..B /.B..C....
D..L... '.../..B..C.....
......O.E..L.D.........
omec >
ABournia:kw* DS kov hol t*
ASc 'dncer Joodhead*
sunnAuch 5../.1.4../. 82...
5./.14../.E.2.......... 5 /... /.82
..... 5../.1.7../. 8. 2.....
04re >
OFFICIAL RECORD COPY
~
useo:--meaa unc ronu m ocum nacu oso
1
\\
~?
~
La Salle Mr. Louis 0. De1 George Director of Nuclear Licensing Commonwealth Edison Company P. O. Box 767 Clyicago, Illinois 60690
~
cc: Philip P. Steptoe, Esquire Suite 4200 One First National Plaza Chicago, Illinois 60603 Dean Hansell, Esquire Assistant Attorney General 188 West Randolph Street Suite 2315
- 6 Chicago, Illinois 60601 g'"
William G. Guldemond, Resident Inspector
(*
LaSalle NPS, U.S.N.R.C.
s P. O. Box 224 Marseilles, Illinoir 61364 4
1 k
(
e
(
.h
.=
e 1
5
, c i
f l
l
~u.
o I
e l
.r
't
,e s
o s
4 ()
\\
C.
DISTRIBUTION:
1 s,
1 i
Docket File
'\\
LB #2 File ABournia
'Docktt Now 50-373 i"
s' EHylton s
I&E s
'. \\
'i
\\
CWoodhead, OELD 3
ACRS (16)
Mr. Louis % DelGeorge bec: NRC PDR Director of Nuclear Licensing Local PDR m.
Commonwealth Edison (s.lpany
\\
NSIC 1
P. D. Box 767.
'^
Chicag Q IM iaois 60690
.C s
Dear Mr. De.lGeort :
i g..
Inte-hretation of. Technical pecifichtfon - Reporting.
Requintients when Special R]eports are ' Indicated in Action
Subject:
Statements - La Salle County Station Unit' No.1
(
q
- ' Id dmonw(alth Ediso$'s letter dated Apr/ealth has made and provide you il 24,1982, it was requested that Gd, hyfew thd intarpretation that Comont oMinteipretation relative to the La Salle Technical Specifications in which
- act<f on ttateuents such as:
\\
11c$ the' system is-not returned. operable within days, in "l
u of any other report requireit by Spedification 6.6 A or y
6.El B, Orepare and submit to tt}e Comissibn within '30 days, if
, pursuant to Specification 'S.6 C, & Special(Report outlining cerjaininformation. The. pro /isions of Specification's 3.0.3 P
i
- abd 3.0.4 are not applicables" l4
-- It was friticated that Commonweal;/.h Edison Company interprets this wording
.l r
to mean t. hat if the system is-ipoperable but is rjestored to operation
/
l within the specified time period in the action statement, no report L
pursuant "to Specification 6.6.4 to the NRC is reqifred.
If the system is notiisturned to operable within the specified Kime period, a Special Report shall be submitted wiyhin the'specified timp frame in lieu of any othen report required by Specification 6.6 A o 6.6 B.
We agree with your" interpretation.
, Sincerely,
- /
A. Schwencer, Chief Licensing Branch No. 2 Division of L_icensing
~
r q
cc See next p. ige
- SEE PREVIOUS PAGE FOR CONCURRENCES
!CL:LB#2/PM DL:LGB/BC DL:LBd2
.........a../..B C OELD
~ ~ ~ -
~ - - ~ ~ ~ ~
omce >
... -. - -.. ~. ~. - -, - - - - -
sunme)...N.0E:".i a,: k,a Q D,S,k,g,y h, glt
,,A,S,h,wenc,et,,,,,_*Mcdhwl.,__ _ _
S, fl.13./.O.L/)
.l..W.l.41.02........ll......J.82...... 5/.1.7d2...-
--~~~~~.
~ ~ ~ ~ ~ ~ -
-- ~~---
.ouey OFFICIAL RECORD COPY uso mi-sz*o
, mac ronu sisjma.ycy ovo
y w
DISTRIBUTION:
Docket File bec: NRC PDR LB#2 File Local P.OR ABournia NSIC EHylton PRC I&E.
Docket No. 50-373 Woodhead, OELD ACRS (16)
Mr. Louis 0. DelGeorge Director of Nuclear Licensing Commonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690
Dear Mr. DelGeorge:
Subject:
Interpretation of Technical Specifjcation - Reporting Requirements when Special Reports are Irdicated in Action Statements - La Salle County Stat on, Unit No.1
\\
In Commonwealth Edison's letter dated Apri 24, 1982, it was requested that we review the interpretation'that Conmonwealth has made and provide you with our interpretation relatiYe to the La Salle Technical Specifications in which action statements such as:
"If the system is not returned tq perable within days, in lieu of any other repor required by Specification 6.6 A or G.6 B, prepare and subm, t to the Commission within 30 days, pursuant to Specificat n,6.6 C, a Special Report outlining certain information.
he. provisions of Specification's l e."\\
3.0.3 and 3.0.4 are not applic It was indicated that Commonwealth dison Company interprets this working to mean that if the system is inop able but is restored to operation within the specified time period i the action statement, no report to the NRC is required.
If the syst is not r4 turned to operable within the specifled time period, a Spec al Report shall be submitted within agree with y\\ report required by f any other the specified time frame in lieu our interpretation.
Specification 6.6 A or 6.6 B.
W
- incerely, A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing l
cc: See next page l
l n Jl
,> v OFFICE )... l.h.h...[.h.h....b. f...Ehol t.........
..D.L..Q,4,M..Q..,
O,,,.$.Q,3. O
- Mu.
D 101 ASchwencer ABournia:pt 3
t suaune >
,s,g............
sz..za2,,,,,,,,.,, ; /82 t,8,2, 5!.!.jl82,,,,,,
om>
NRC FORM 318 (10-80) NRCM 024o OFFiClAL RECORD COPY uso m isai-m e
_ _