. OPERATING DATA REPORT DOCKET NO.

50-244 DATE May 6, 1982 COMPIEIED BY /J J _c-8.?ncQ a: m -

Andrew E. McNamara

'IELEPfKNE 1 (315) 524-4446 OPERATING STA'IUS Ext. 293 or 501

1. Unit Name: GIW A STATION, UNIT #1 Notes: We unit remained shutdown for
2. Reporting Period: April, 1982 the entire report period for repairs
3. Licensed % ermal Power (Mt):

1520 to the "B" Steam Generator and normal

4. Nameplate Rating (Gross MWe):

490 refueling and maintenance outage

5. Design Electrical Rating (Net MWe): 470 activities.
6. Maximum Dependable Capacity (Gross me): 490
7. Maximin Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Ntaber 3 through 7) Since Last Report, Give Reasons:
9. Power Level to tich Restricted, If Any (Net PWe):
10. Reasons Ibr Restrictions, If Any:

Wis Pbnth Yr.-to-Date Cumuulative

11. Ilours In Reporting Period 719.00*

2,879.00 108,935.00

12. Ntaber of Hours Reactor Was Critical 0

585.5 82,228.12

13. IMactor Reserve Shutdown Hours 0

0 1,631.32**

14. Hours Generator On-Line 0

585.5 80,413.13

15. Unit Reserve Shutdown Hours 0

0 8.5 **

16. Gross h ermal Energy Generated (MHH) 0 881,568 109,787,122
17. Gross Electrical Energy Generated (MNH) 0 288,921 35,723,886
18. Net Electrical Energy Generated (MWH) 0 274,977 33,853,050
19. Unit Service Factor 0%

20.34%

73.82%

20. Unit Availability Factor 0%

20.34%

73.83%

21. Unit Capacity Factor (Using P0C Net) 0%

20.32%

68.12%

22. Unit Capacity Factor (Using DER Net) 0%

20.32%

68.12%

23. Unit Ibrced Outage Rate 0%

22.41%

9.0%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End Of Report Period, Estimated Date Of Startup: May 22, 1982 i
26. Units In Test Status (Prior to Ccumercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECI'RICITY COMERCIAL OPERATIO4 l

Eastern Standard Time to Eastern Daylight Savings Time.

00 Ctenulative total Ocamencing January 1,1975.

8206010(o d C

. AVEIUGE IRILY UNIT POWER LEVEL DOOTT NO.

50-244 (MIT #1 Ginna Station IRTE May 6, 1982 CCNPIRIED BY (Wd,Mwh Andrew E. McNamara

'IELEPfKNE - 1 (315) 524-4446 Ext. 293 or 501 M[NIYi April, 1982 DAY AVEIUGE DAILY POWER LEVEL IRY AVERAGE IRILY POWER LEVEL (Mie-Net)

(790e-Net) 1.

17.

2.

18.

3.

19.

4.

20.

5.

21.

6.

22.

7.

23.

8.

24.

9.

25.

10.

26.

11.

27.

12.

28.

29.

13.

14.

30.

15.

31.

16.

INSIl0CTICNS On this format, list the average daily unit power level in PeGe-Net for each day in the reporting month. Conpute to the nearest whole megawatt.

s DOGET E 50-244 UNIT NAME #1 Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE May_6,_1982 0 08

') BY

/L i ef, W4 Andrew E. McNamara' l

REPOf& MCNIYI April, 1982 TELEPHCNE 1 (315) 524-4446 l

Ext. 293 or 501 Method of Duration Reason Shutting Licensee System (baponent Cause & Corrective No.

Date Type 1 (Hours) 2 Down Event Code 4 Code 5 Action to Reactor 3 Report #

Prevent Recurrence 01 01/25/82 S*

719

  • C 3

82-003

'Ihe unit remained shutcbwn for the entire period for repairs to the "B" Steam Generator and notinal refueling and maintenance outage activities.

/

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event A port (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 b'

H-Other (Explain)

Exhibit 1 - Same Sour

  • On February 22, 1982, regularly scheduled refueling shutdown hours commenced, reflected by the change frun forced outage to scheduled outage hours.

O d NARRATIVE SUP9%IN OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit il DPTE May 6, 1982 0MPIEIED BY d= S- - E.%'>1o- - -

Andrew E. McNamara

'IELEPHONE 1 (315) 524-4446 Ext. 293 or 501 Marmi April, 1982

'Ihe unit remained shutdown in the report period for Steam Generator inspection and repairs.

Normal refueling activities were coupleted.

Ibutine shutdown maintenance proceeded according to schedule.

1 e

/'

1 GIMIA SMTIOi Maintenance Report April, 1982 i