ML20053C035

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Apr 1982
ML20053C035
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/17/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20053C036 List:
References
NUDOCS 8206010437
Download: ML20053C035 (1)


Text

.

. _~

t DALTIMORE GAS AND ELECTRIC

~

i CHARLES CENTER. P.O. BOX 1475 BALTIMORE. MARYLAND 21203 rossic ro.in espantutur d

May 17, 1982 Director Office of Inspection and Enforcement i

U.S. Nuclear Regulatory Commission j

Wanhington, D.C. 20055 j

ATTENTION: Document Control Desk s

Contlemen:

j Enclosed herewith is the April, 1982

- Operation Status Report for Calvert Cliffs No.1 Unit, (Docket 50-317) and Calvert Cliffs No.

2 Unit, (Docke t 50-318).

Sincerely, b,

u r.

a E. M. Lotito Performance Data Analyser l

Production Economy and Results Unit Fossil Power Department

Enclosure:

cc: Directorate of Regulatory Operations Nuclear Safety Analysis Center Region 1 3412 Hillview Avenue U.S. Nuclear Regulatory Commission P.O. Box 10412 Palo Alto, CA 94303 S. M. Long Power Plant Siting - MD L. B. Russell W. L. LeConte

~

A. M. ttaszaros J. A. Tiernan C. L. Shoemaker R. Architzel A. E. Lundvall, Jr.

P. D. Sierer, Jr.

I R. F. Ash P. Kruse

(

C. Cintulo S. M. Long

~

j EML/dch gs# gf 820 6 010 'm Q

k'

[